Outline View Sample Clauses

Outline View. The outline view (Fig. 2‐12) provides another view of the physical substrate. It is a tree viewer that shows all the devices in the substrate. Each element in the outline can be expanded to show its internal resource structure i.e. slots, ports, channels, VLANs. When expanded to show the channel, the current state of that channel is also shown. A resource can be also selected to show all of its state in the properties view.
AutoNDA by SimpleDocs

Related to Outline View

  • Outline The Delegate Agreement (that is, the contract between you and the Institute) includes the Delegate Agreement itself, which starts on page 2, and also: • The content of your Application Form; • Schedule 1: Code of Conduct, on page 13; • Schedule 2: Waiver, on page 14; and • Schedule 3: Model Release Form, on page 15. Delegate Agreement Between the Aotearoa Youth Leadership Institute and You (together, the Parties).

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Site Description 2.5.1 If reasonably requested by the A/E as necessary for the Project, the Owner shall furnish a legal description and a certified land survey of the Site, giving, as applicable, grades and lines of streets, alleys, pavements and adjoining property; rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the Site; locations, dimensions, and complete data pertaining to existing buildings, other improvements, and trees; and full information concerning available service and utility lines, both public and private, above and below grade, including inverts and depths.

  • General Project Description 2. Substation location.

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Overtime Description Overtime Wage paid at time and one half the regular rate For "A" rated Apprentices (work in excess of 7 hours per day) For "M" rated Apprentices (work in excess of 8 hours per day) (Local #3) ELEVATOR CONSTRUCTOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator (Constructor) - First Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $26.94 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $28.41 Elevator (Constructor) - Second Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $27.35 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $28.84 Elevator (Constructor) - Third Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $28.17 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $29.69 Elevator (Constructor) - Fourth Year Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $29.00 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $30.54 (Local #1) ELEVATOR REPAIR & MAINTENANCE‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 2) Elevator Service/Modernization Mechanic (First Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $26.87 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Benefit Per Hour: $28.34 Elevator Service/Modernization Mechanic (Second Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $27.27 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Benefit Per Hour: $28.76 Elevator Service/Modernization Mechanic (Third Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $28.08 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Benefit Per Hour: $29.60 Elevator Service/Modernization Mechanic (Fourth Year) Effective Period: 7/1/2015 - 3/16/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $28.89 Effective Period: 3/17/2016 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Benefit Per Hour: $30.43 (Local #1) ENGINEER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.68 Supplemental Benefit Rate per Hour: $22.55 Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.60 Supplemental Benefit Rate per Hour: $22.55 Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.56 Supplemental Benefit Rate per Hour: $22.55 Engineer - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $35.52 Supplemental Benefit Rate per Hour: $22.55 (Local #15) ENGINEER - OPERATING‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 5) Operating Engineer - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour 40% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 Operating Engineer - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's Rate Supplemental Benefit Per Hour: $20.15 (Local #14) FLOOR COVERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Floor Coverer (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 65% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 Floor Coverer (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.14 (Carpenters District Council) XXXXXXX‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $13.64 Effective 11/1/2015 - Supplemental Rate Per Hour: $13.79 Xxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $22.97 Effective 11/1/2015 - Supplemental Rate Per Hour: $23.13 Xxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $25.87 Effective 11/1/2015 - Supplemental Rate Per Hour: $26.03 Xxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $31.04 Effective 11/1/2015 - Supplemental Rate Per Hour: $31.29 (Local #1281) HEAT & FROST INSULATOR‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Heat & Frost Insulator (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Heat & Frost Insulator (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Heat & Frost Insulator (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 70% of Journeyperson's rate Heat & Frost Insulator (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #12) HOUSE WRECKER‌ (TOTAL DEMOLITION) (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) House Wrecker - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.17 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.32 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.97 Supplemental Benefit Rate per Hour: $17.33 House Wrecker - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.53 Supplemental Benefit Rate per Hour: $17.33 (Xxxxx Tenders District Council) IRON WORKER - ORNAMENTAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Iron Worker (Ornamental) - 1st Ten Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.50 Iron Worker (Ornamental) - 11 -16 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 55% of Journeyperson's rate Supplemental Rate Per Hour: $37.62 Iron Worker (Ornamental) - 17 - 22 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $38.73 Iron Worker (Ornamental) - 23 - 28 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 70% of Journeyperson's rate Supplemental Rate Per Hour: $40.97 Iron Worker (Ornamental) - 29 - 36 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 80% of Journeyperson's rate Supplemental Rate Per Hour: $43.20 (Local #580) IRON WORKER - STRUCTURAL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 6) Iron Worker (Structural) - 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $25.48 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 7- 18 Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.08 Supplemental Benefit Rate per Hour: $46.83 Iron Worker (Structural) - 19 - 36 months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.68 Supplemental Benefit Rate per Hour: $46.83 (Local #40 and #361) LABORER (FOUNDATION, CONCRETE, EXCAVATING, STREET PIPE LAYER & COMMON)‌ (Ratio Apprentice to Journeyperson: 1 to 1, 1 to 3) Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - First 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 50% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Second 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 60% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Third 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 75% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 Laborer (Foundation, Concrete, Excavating, Street Pipe Layer & Common) - Fourth 1000 hours Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 90% of Journeyperson's rate Supplemental Rate Per Hour: $36.53 (Local #731) MARBLE MECHANICS‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Cutters & Setters - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Cutters & Setters - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 55% of Journeyperson's rate Cutters & Setters - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 65% of Journeyperson's rate Cutters & Setters - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Cutters & Setters - Fifth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 85% of Journeyperson's rate Cutters & Setters - Sixth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 95% of Journeyperson's rate Polishers & Finishers - First 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 50% of Journeyperson's rate NO BENEFITS PAID DURING THE FIRST TWO MONTHS (PROBATIONARY PERIOD) Polishers & Finishers - Second 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Polishers & Finishers - Third 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 75% of Journeyperson's rate Polishers & Finishers - Fourth 750 Hours Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 90% of Journeyperson's rate (Local #7) XXXXX TENDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Xxxxx Xxxxxx - First Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $21.39 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Second Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $22.54 Supplemental Benefit Rate per Hour: $18.44 Xxxxx Xxxxxx - Third Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $24.29 Supplemental Benefit Rate per Hour: $18.49 Xxxxx Xxxxxx - Fourth Year Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $26.95 Supplemental Benefit Rate per Hour: $18.49 (Local #79) METALLIC LATHER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Metallic Lather (First Year -Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $29.41 Supplemental Benefit Rate per Hour: $22.89 Metallic Lather (Second Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $34.01 Supplemental Benefit Rate per Hour: $24.54 Metallic Lather (Third Year - Called Prior to 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $39.07 Supplemental Benefit Rate per Hour: $25.69 Metallic Lather (First Year -Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $23.01 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Second Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.11 Supplemental Benefit Rate per Hour: $17.95 Metallic Lather (Third Year - Called On Or After 6/29/11) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $33.21 Supplemental Benefit Rate per Hour: $17.95 (Local #46) MILLWRIGHT‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 4) Xxxxxxxxxx (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.23 Supplemental Benefit Rate per Hour: $34.06 Xxxxxxxxxx (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $32.18 Supplemental Benefit Rate per Hour: $37.62 Xxxxxxxxxx (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $37.13 Supplemental Benefit Rate per Hour: $41.83 Xxxxxxxxxx (Fourth Year) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $47.03 Supplemental Benefit Rate per Hour: $48.31 (Local #740) PAVER AND ROADBUILDER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Paver and Roadbuilder - First Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $27.05 Supplemental Benefit Rate per Hour: $17.12 Paver and Roadbuilder - Second Year (Minimum 1000 hours) Effective Period: 7/1/2015 - 6/30/2016 Wage Rate per Hour: $28.69 Supplemental Benefit Rate per Hour: $17.12 (Local #1010) PAINTER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painter - Brush & Roller - First Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $15.80 Supplemental Benefit Rate per Hour: $11.88 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $16.40 Supplemental Benefit Rate per Hour: $12.13 Painter - Brush & Roller - Second Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $19.75 Supplemental Benefit Rate per Hour: $15.73 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $20.50 Supplemental Benefit Rate per Hour: $15.98 Painter - Brush & Roller - Third Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $23.70 Supplemental Benefit Rate per Hour: $18.64 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $24.60 Supplemental Benefit Rate per Hour: $18.89 Painter - Brush & Roller - Fourth Year Effective Period: 7/1/2015 - 10/31/2015 Wage Rate per Hour: $31.60 Supplemental Benefit Rate per Hour: $24.02 Effective Period: 11/1/2015 - 6/30/2016 Wage Rate per Hour: $32.80 Supplemental Benefit Rate per Hour: $24.27 (District Council of Painters) PAINTER - STRUCTURAL STEEL‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Painters - Structural Steel (First Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 40% of Journeyperson's rate Painters - Structural Steel (Second Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 60% of Journeyperson's rate Painters - Structural Steel (Third Year) Effective Period: 7/1/2015 - 6/30/2016 Wage and Supplemental Rate Per Hour: 80% of Journeyperson's rate (Local #806) PLASTERER‌ (Ratio of Apprentice to Journeyperson: 1 to 1, 1 to 3) Plasterer - First Year: 1st Six Months Effective Period: 7/1/2015 - 6/30/2016 Wage Rate Per Hour: 40% of Journeyperson's rate Supplemental Rate Per Hour: $15.76

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial Xxxx Xxxxx ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial Xxxx Xxxxx ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Trading Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Trading Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).

  • Service Outline 3.1 The pharmacist will:

Time is Money Join Law Insider Premium to draft better contracts faster.