Common use of Owner’s Special Cash Allowance Clause in Contracts

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format.

Appears in 6 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC OCP Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format.

Appears in 6 contracts

Samples: Agreement, Agreement, Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 01150 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule TAB 8 - Bid/Proposal Package Strategy The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Tab 7 on 8 ½ x 11 formatOwner’s Specification Section 01210. TAB 9 - Historically Underutilized Business Plan Complete the attachments required by exhibit of the Agreement. For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout.

Appears in 4 contracts

Samples: Agreement, Agreement, Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Owner Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format. TAB 8 - Bid/Proposal Package Strategy • The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Owner’s Specification Section 01 31 00. TAB 9 - Historically Underutilized Business Plan • Complete the attachments required by exhibit of the Agreement. • For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. • A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments • For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal. • For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. • Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein.

Appears in 2 contracts

Samples: cdn.cocodoc.com, Sample Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format. TAB 8 - Bid/Proposal Package Strategy  The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Owner’s Specification Section 01 31 00. TAB 9 - Historically Underutilized Business Plan  Complete the attachments required by exhibit of the Agreement.  For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E.  A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments  For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal.  For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10.  Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein.

Appears in 2 contracts

Samples: Agreement, Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC RECP Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format.

Appears in 1 contract

Samples: Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC CPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format. TAB 8 - Bid/Proposal Package Strategy • The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Owner’s Specification Section 01 31 00. TAB 9 - Historically Underutilized Business Plan • Complete the attachments required by exhibit of the Agreement. • For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. • A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments • For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal. • For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. • Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein.

Appears in 1 contract

Samples: Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC CPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements DRAFT  The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format.. TAB 8 - Bid/Proposal Package Strategy  The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Owner’s Specification Section 01 31 00. TAB 9 - Historically Underutilized Business Plan  Complete the attachments required by exhibit of the Agreement.  For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E.  A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments  For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal.  For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. DRAFT  Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein. ATTACHMENT 2 TO EXHIBIT D PAYMENT AND PERFORMANCE BONDS DRAFT (Included herein by reference. Actual Bonds shall be drafted by Owner and executed after the execution of the GMP Proposal) EXHIBIT E Surety Bond No. SECURITY BOND STATE OF TEXAS § COUNTY OF § KNOW ALL MEN BY THESE PRESENTS: That we, , as Principal, and , as Surety, are hereby held and firmly bound unto The Board of Regents of The University of Texas System as Obligee in the penal sum of Five Percent (5%) of ($ ), the Guaranteed Maximum Price (GMP) for the Project defined herein below, for payment whereof the said Principal and Surety bind themselves, their heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. Whereas the Principal has executed a contract, with Obligee for the use and benefit of , , dated , (the “Contract”), for , Project No. , (the “Project”). DRAFT

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 01150 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty twenty-one (6021) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner P6 software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule TAB 8 - Bid/Proposal Package Strategy • The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Tab 7 on 8 ½ x 11 formatOwner’s Specification Section 01210. TAB 9 - Historically Underutilized Business Plan • Complete the attachments required by exhibit of the Agreement. • For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. • A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments • For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal. • For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. • Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein. ATTACHMENT 2 TO EXHIBIT D PAYMENT AND PERFORMANCE BONDS EXHIBIT E Surety Bond No. SECURITY BOND STATE OF TEXAS § COUNTY OF § KNOW ALL MEN BY THESE PRESENTS: That we, , as Principal, and , as Surety, are hereby held and firmly bound unto The Board of Regents of The University of Texas System as Obligee in the penal sum of Five Percent (5%) of ($ ), the Guaranteed Maximum Price (GMP) for the Project defined hereinbelow, for payment whereof the said Principal and Surety bind themselves, their heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. Whereas the Principal has executed a contract, with Obligee for the use and benefit of , , dated , (the “Contract”), for , Project No. , (the “Project”).

Appears in 1 contract

Samples: Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule in Tab 7 on 8 ½ x 11 format. TAB 8 - Bid/Proposal Package Strategy • The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Owner’s Specification Section 01 31 00. TAB 9 - Historically Underutilized Business Plan • Complete the attachments required by exhibit of the Agreement. • For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. • A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments • For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal. • For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. • Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein.

Appears in 1 contract

Samples: Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC OCP Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 01150 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule TAB 8 - Bid/Proposal Package Strategy • The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Tab 7 on 8 ½ x 11 formatOwner’s Specification Section 01210. TAB 9 - Historically Underutilized Business Plan • Complete the attachments required by exhibit of the Agreement. • For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. • A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout. TAB 10 - Responses to Review Comments • For resubmitted GMP Proposals, include all review comments provided by the Owner regarding the GMP or GMP re-submittal. • For each submittal the Contractor shall provide a written response below each original comment, stating the appropriate response to the issue and include that documentation in this section. A re-submittal may not be forwarded to Owner without responses to the previous review comments and included under this TAB 10. • Any proposed deviations from the provisions or processes described in the Agreement, contained in this Proposal, shall be approved in writing by the Associate Director of Project Management and included herein. ATTACHMENT 2 TO EXHIBIT D PAYMENT AND PERFORMANCE BONDS EXHIBIT E Surety Bond No. SECURITY BOND STATE OF TEXAS § COUNTY OF § KNOW ALL MEN BY THESE PRESENTS: That we, , as Principal, and , as Surety, are hereby held and firmly bound unto The Board of Regents of The University of Texas System as Obligee in the penal sum of Five Percent (5%) of ($ ), the Guaranteed Maximum Price (GMP) for the Project defined hereinbelow, for payment whereof the said Principal and Surety bind themselves, their heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. Whereas the Principal has executed a contract, with Obligee for the use and benefit of , , dated , (the “Contract”), for , Project No. , (the “Project”).

Appears in 1 contract

Samples: Agreement

Owner’s Special Cash Allowance. Provide a breakdown of the Owner’s Special Cash Allowance showing the major items anticipated to be included in this cost. The OFPC OCP Project Manager should help provide this detail. TAB 7 - Master Project Schedule (Summary Level) The Summary Level schedule shall be submitted electronically on a 3.5” diskette or CD and as a Xxxxx Chart Report within the GMP Proposal showing the Activity ID, Activity Description, Original Duration, Early Start, Early Finish, Total Float, Late Start and Late Finish column titles. Summary Schedule Requirements The schedule shall comply with the requirements of Owner’s Specification Section 01 32 00 01150 and shall form the basis for the “Detail” schedule, which shall be submitted within sixty (60) days following Notice to Proceed for Construction Services. The schedule shall be a computer generated CPM schedule developed in Primavera Project Planner software. The schedule shall be presented in “bar chart” form and contain detailed activities for all events and milestones included in Pre-construction Services The schedule shall include detailed, logic driven activities for all Construction Service activities scheduled to commence during the first ninety (90) days following the Notice to Proceed for Construction. The remaining construction activities (those commencing after the first 90 days) may be summarized by trades and may have longer durations than the “detailed” activities mentioned above. Total Float The total float indicated on the Master Project Schedule shall be no less than 10% of the total Construction Phase duration (NTP to Substantial Completion). i.e. - All paths in the schedule must lead to a milestone activity for Substantial Completion, which shall be logic driven and indicate completion within approximately 90% of the time allowed by contract for the Owner established Substantial Completion Date. Provide schedule TAB 8 - Bid/Proposal Package Strategy The Contractor shall provide a written Bid/Proposal Package Strategy for procuring subcontracts including self-performance work (other than General Conditions) as described in Tab 7 on 8 ½ x 11 formatOwner’s Specification Section 01210. TAB 9 - Historically Underutilized Business Plan Complete the attachments required by exhibit of the Agreement. For all first and second tier subcontractors currently under contract or anticipated to be contracted with, provide completed Attachments C, D, and E. A completed HUB Subcontracting Plan shall be delivered to Owner at the time of final subcontracting buyout.

Appears in 1 contract

Samples: Agreement