Part C – Pipeline Additional Installations Pricing Sample Clauses

Part C – Pipeline Additional Installations Pricing. The Items in Part C are to be paid according to the Fixed Unit Prices. The Fixed Unit Prices will be used regardless of any differences between estimated and actual quantities. Payment will be based on Measured Quantities that are approved by Owner.
AutoNDA by SimpleDocs

Related to Part C – Pipeline Additional Installations Pricing

  • Maintenance Repairs Utility Installations Trade Fixtures and Alterations 7.1 Lessee's Obligations.

  • Additional Equipment RX agrees to install and/or supply additional Equipment, as determined by mutual agreement of the parties, at no additional cost to Six Flags.

  • Additional Improvements Common Area Operating Expenses shall not include Real Property Taxes specified in the tax assessor's records and work sheets as being caused by additional improvements placed upon the Industrial Center by other lessees or by Lessor for the exclusive enjoyment of such other lessees. Notwithstanding Paragraph 10.1 hereof, Lessee shall, however, pay to Lessor at the time Common Area Operating Expenses are payable under Paragraph 4.2, the entirety of any increase in Real Property Taxes if assessed solely by reason of Alterations, Trade Fixtures or Utility Installations placed upon the Premises by Lessee or at Lessee's request.

  • ALTERATIONS - ADDITIONS The LESSEE shall not make structural alterations or additions to the leased premises, but may make non-structural alterations provided the LESSOR consents thereto in writing, which consent shall not be unreasonably withheld or delayed. All such allowed alterations shall be at LESSEE's expense and shall be in quality at least equal to the present construction. LESSEE shall not permit any mechanics' liens, or similar liens, to remain upon the leased premises for labor and material furnished to LESSEE or claimed to have been furnished to LESSEE in connection with work of any character performed or claimed to have been performed at the direction of LESSEE and shall cause any such lien to be released of record forthwith without cost to LESSOR. Any alterations or improvements made by the LESSEE shall become the property of the LESSOR at the termination of occupancy as provided herein.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Utility Additions Lessor reserves the right to install new or additional utility facilities throughout the Office Building Project for the benefit of Lessor or Lessee, or any other lessee of the Office Building Project, including, but not by way of limitation, such utilities as plumbing, electrical systems, communication systems, and fire protection and detection systems, so long as such installations do not unreasonably interfere with Lessee's use of the Premises.

  • Utility Installations Trade Fixtures Alterations 8.3.1 The term “Utility Installations” refers to all floor and window coverings, air and/or vacuum lines, power panels, electrical distribution, security and fire protection systems, communication cabling, lighting fixtures, HVAC equipment, plumbing, and fencing in or on the Premises. The term “

  • Office Space, Equipment and Facilities Provide such office space, office equipment and office facilities as are adequate to fulfill the Adviser’s obligations hereunder.

  • Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

Time is Money Join Law Insider Premium to draft better contracts faster.