Performance and Other Implementation Requirements Sample Clauses

Performance and Other Implementation Requirements. ‌ Your server must be robust, in the sense that no message shall be lost when the server is terminated, except possibly a message that is currently being written to disk. The bulletin board file should be considered too large to be kept completely in memory. Your server must also be efficient, in the sense that it must not rewrite the whole bulletin board file upon the receipt of each and every message. It should use the file system as little as possible (within the robustness requirements above). Now it is also the time to think about and implement a mechanism for rolling back the most recent transaction (write or replace). This is going to be used in the second part of the assignment. You must build a concurrent server, which is able to serve many clients simultaneously. You must pro- vide an implementation based on POSIX threads, using concurrency management and thread preallocation (as explained in Section 1.4).
AutoNDA by SimpleDocs

Related to Performance and Other Implementation Requirements

  • Design Requirements 9.2.1. Metal liner The compressive stress in the liner at zero pressure and 15 °C shall not cause the liner to buckle or crease.

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

  • Installation requirements 7.8 We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.

  • Forecasting Requirements for Trunk Provisioning Within ninety (90) days of executing this Agreement, Reconex shall provide Verizon a two (2) year traffic forecast. This initial forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Local Interconnection Trunk groups over the next eight (8) quarters. The forecast shall be updated and provided to Verizon on an as-needed basis but no less frequently than semiannually. All forecasts shall comply with the Verizon CLEC Interconnection Trunking Forecast Guide and shall include, at a minimum, Access Carrier Terminal Location (“ACTL”), traffic type (Local Traffic/Toll Traffic, Operator Services, 911, etc.), code (identifies trunk group), A location/Z location (CLLI codes for Reconex-IPs and Verizon-IPs), interface type (e.g., DS1), and trunks in service each year (cumulative).

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Trunk Forecasting Requirements 14.2.1 Initial trunk forecast requirements. At least ninety (90) days before initiating interconnection in a LATA, Alltel shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Trunking Requirements 7.2.2.9.1 The Parties will provide designed Interconnection facilities that meet the same technical criteria and service standards, such as probability of blocking in peak hours and transmission standards, in accordance with current industry standards.

  • Certification Requirements The applicant will provide Vista Laboratories, Inc. with all product information for the evaluation of the product to be certified and warrant that the information provided is accurate and complete so that Vista Labs may perform the services requested. If the product was tested at an external laboratory, the applicant must provide the complete test report to Vista Labs. If the external testing facility is not ISO 17025 accredited, or does not have the proper scope, Vista Labs must determine if the test report can be used for certification activities. The applicant’s information is used to perform a product review and evaluation to determine the product’s compliance to the specific certification requested. Throughout the process, the client agrees to make claims regarding certification consistent with the scope of certification. The applicant agrees to supply the required number of product samples, to be determined by Vista Labs, to the laboratory for testing, measurement, and evaluation purposes. The client understands that certain tests may damage or destroy the sample and acknowledge that Vista Labs is not responsible for such damages. Samples will be returned only upon request by the applicant and at the applicant’s expense, after the completion of certification. Samples will be disposed of after six months if not requested for return by applicant. The product is ineligible for certification if it has been modified by the client after testing or certification. Changes to the product must be approved by Vista Laboratories. Vista Labs reserves the right to re- evaluate the product as a result of information that raises questions concerning the conformance of the product. Certified products maintain fulfilment of product requirements if the certification applies to ongoing production. If the client provides copies of the certification documents to other parties, the documents are reproduced in their entirety, or as specified in the certification scheme. In making reference to its product certification in media, such as brochures or advertisement, the client complies with the requirements of the Vista Labs or as specified by the certification scheme. The client complies with any requirements that may be prescribed in the certification scheme relating to the use of marks of conformity, and on all product correspondences and product related information. Vista Labs reserves the right to revise or withdraw the requirements as required in order to maintain conformance with FCC rules and regulations governing the product. The product may continue with certification and receive certification upon demonstration of compliance with the revised requirements, to the satisfaction of Vista Laboratories.

Time is Money Join Law Insider Premium to draft better contracts faster.