Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.
Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
GLASS The Tenant shall maintain the glass part of the demised premises, promptly replacing any breakage and fully saving the Landlord harmless from any loss, cost or damage resulting from such breakage or the replacement thereof.
FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.
Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.
Moonlighting Employment as a physician in a professional capacity outside of what is outlined in this Agreement, whether temporary special medical activity (“TSMA”) or external moonlighting, must be approved in writing, in advance, by the Departmental Chair, Program Director and Director of Graduate Medical Education (or designee). Even if approved, professional and general liability insurance as outlined in Section 5.4 is not provided to Trainee engaged in external moonlighting. Trainee acknowledges he or she has the responsibility to obtain insurance for such engagement. TSMA and external moonlighting must be included and reported as part of Trainee's hours spent on clinical experience and education. Trainee shall not be required to engage in any outside work.
Safety Glasses Section 1. The City shall supply prescription safety glasses with plastic lenses to employees who are required to wear safety glasses and who are members of the classifications contained in Appendix C to this contract. Safety glasses which are authorized must be industrial grade safety glasses which meet or exceed the requirements of ANSI Specification Z87. 1. All employees who are required to wear safety glasses shall also be required to wear side xxxxxxx, either permanent or snap-on, whenever an eye hazard exists. Solid tinted glasses will not be approved unless required by prescription. Photogray, progressive, scratch coating and/or anti-glare lenses may be considered for those employees who primarily work outdoors or as prescribed. In the event that additional classes are identified as needing either prescription safety glasses or protective eyewear, such classes may be added to the classification list in Appendix C upon approval of PAGE and the City. Section 2. The City agrees to pay the full cost of required prescription safety glasses, with frames not to exceed $75.00. This excludes the cost of the eye examination which will be the responsibility of the employee. The effected employees will be allowed one (1) replacement of safety glasses every two (2) years. In the event the safety glasses become lost, unserviceable, or broken on the job, the employee must present a written request for replacement to the Department Head and Human Resources Director. If the employee breaks his safety glasses while on the job, the Department shall replace the glasses at no cost to the employee. The replacement of lost glasses or glasses that are broken off the job will be at the discretion of the Department Head and Human Resources Director. If an employee has been provided safety glasses by the City, the employee shall be permitted to retain possession of the glasses after separation from the City without reimbursing the City for any costs associated with the glasses. Section 3. An employee who is required to wear prescription safety glasses must present a written request to his department head or designated representative. Section 4. The employee must obtain a current prescription and the employee is authorized the use of sick leave not to exceed two (2) hours to accomplish this examination. The employee will obtain a purchase order from the Department Head prior to ordering the safety glasses. The employee will present the purchase order to the appropriate vendor when ordering. The vendor will contact the appropriate Department Head when the glasses are ready for delivery. The Department Head will then notify the employee who will present himself at the vendor for fitting and pickup. Section 5. In the event a probationary employee has been issued safety glasses and terminates his employment with the City for any reason during the probationary period, he shall be required to reimburse the City for any expenses incurred in the purchase of safety glasses.
Landscaping 3.9.1 All plant material shall conform to the Canadian Nursery Landscape Association’s Canadian Nursery Stock Standard (ninth edition or newer). 3.9.2 There shall be an opaque wood fence or masonry wall at least 1.8 metres tall along the eastern property line extending the length of the surface parking area and access to the underground parking area as generally shown on Schedule B. 3.9.3 Prior to the issuance of a Development Permit, the Developer agrees to provide Landscape Plan that comply with the provisions of this section. The Landscape Plan shall be prepared by a Landscape Architect (a full member, in good standing with Canadian Society of Landscape Architects) and comply with all provisions of this section. 3.9.4 Prior to issuance of the first Occupancy Permit the Developer shall submit to the Development Officer a letter prepared by a member in good standing of the Canadian Society of Landscape Architects certifying that all landscaping has been completed according to the terms of this Development Agreement. 3.9.5 Notwithstanding Section 3.9.4, where the weather and time of year do not allow the completion of the outstanding landscape works prior to the issuance of the Occupancy Permit, the Developer may supply a security deposit in the amount of 110 percent of the estimated cost to complete the landscaping. The cost estimate is to be prepared by a member in good standing of the Canadian Society of Landscape Architects. The security shall be in favour of the Municipality and shall be in the form of a certified cheque or automatically renewing, irrevocable letter of credit issued by a chartered bank. The security shall be returned to the Developer only upon completion of the work as described herein and illustrated on the Schedules, and as approved by the Development Officer. Should the Developer not complete the landscaping within twelve months of issuance of the Occupancy Permit, the Municipality may use the deposit to complete the landscaping as set out in this section of the Agreement. The Developer shall be responsible for all costs in this regard exceeding the deposit. The security deposit or unused portion of the security deposit shall be returned to the Developer upon completion of the work and its certification. 3.9.6 All landscape areas designed to be installed upon any portion of the building must be supported by documentation from a Structural Engineer indicating that the building design is able to support any required drainage or additional weight caused by the landscaped area.
Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.