Phase 3 Greenway. The “Phase 3 Greenway” means the Greenway improvements to be designed and constructed in the segment of the Willamette River Greenway that is landward of the top of bank of the Willamette River and located on Phase 3.
AutoNDA by SimpleDocs

Related to Phase 3 Greenway

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Clinical Trials The studies, tests and preclinical and clinical trials conducted by or on behalf of, or sponsored by, the Company, or in which the Company has participated, that are described in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus, or the results of which are referred to in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus, were and, if still pending, are being conducted in all material respects in accordance with protocols, procedures and controls pursuant to, where applicable, accepted professional and scientific standards for products or product candidates comparable to those being developed by the Company and all applicable statutes, rules and regulations of the FDA, the EMEA, Health Canada and other comparable drug and medical device (including diagnostic product) regulatory agencies outside of the United States to which they are subject; the descriptions of the results of such studies, tests and trials contained in the Registration Statement, the Time of Sale Disclosure Package or the Prospectus do not contain any misstatement of a material fact or omit a material fact necessary to make such statements not misleading; the Company has no knowledge of any studies, tests or trials not described in the Disclosure Package and the Prospectus the results of which reasonably call into question in any material respect the results of the studies, tests and trials described in the Registration Statement, the Time of Sale Disclosure Package or Prospectus; and the Company has not received any notices or other correspondence from the FDA, EMEA, Health Canada or any other foreign, state or local governmental body exercising comparable authority or any Institutional Review Board or comparable authority requiring or threatening the termination, suspension or material modification of any studies, tests or preclinical or clinical trials conducted by or on behalf of, or sponsored by, the Company or in which the Company has participated, and, to the Company’s knowledge, there are no reasonable grounds for the same. Except as disclosed in the Registration Statement, the Time of Sale Disclosure Package and the Prospectus, there has not been any violation of law or regulation by the Company in its respective product development efforts, submissions or reports to any regulatory authority that could reasonably be expected to require investigation, corrective action or enforcement action.

  • Clinical 2.1 Provides comprehensive evidence based nursing care to patients including assessment, intervention and evaluation.

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Supplier Diversity Seller shall comply with Xxxxx’s Supplier Diversity Program in accordance with Appendix V.

  • Technology Research Analyst Job# 1810 General Characteristics Maintains a strong understanding of the enterprise’s IT systems and architectures. Assists in the analysis of the requirements for the enterprise and applying emerging technologies to support long-term business objectives. Responsible for researching, collecting, and disseminating information on emerging technologies and key learnings throughout the enterprise. Researches and recommends changes to foundation architecture. Supports research projects to identify and evaluate emerging technologies. Interfaces with users and staff to evaluate possible implementation of the new technology in the enterprise, consistent with the goal of improving existing systems and technologies and in meeting the needs of the business. Analyzes and researches process of deployment and assists in this process.

Time is Money Join Law Insider Premium to draft better contracts faster.