Phase I Archaeological Survey Sample Clauses

Phase I Archaeological Survey. Trileaf will conduct a Phase I archaeological survey for the project’s defined area of direct effects, as described previously in this proposal. This work will incorporate appropriate methods of identification for both precontact and historical archaeological resources. The goals for Phase I Archaeological survey include: • Identify archaeological resources within the Area of Potential Effect (APE) and document their specific archaeological contexts. • To assess the potential for encountering intact soils and archaeological sites, shovel testing will be implemented throughout the APE-DE at no more than 15-meter intervals per MOSHPO guidelines. • If possible, determine the eligibility of each archaeological resource for listing in the NRHP. • Discuss eligibility/non-eligibility of minor and/or repetitiously occurring sites. • Identify those archaeological resources that are recommended for additional testing to evaluate their NRHP eligibility. Xxxxxxx has made several assumptions regarding the completion of this archaeological survey. Our assumptions include: • No formal consultation with SHPO will be required prior to survey. • No more than two archaeological resources requiring recordation will be identified during the survey. • No deep testing will be required. • No more than two (2) days will be required for the completion of the Phase I investigations. • No formal safety training or specialized safety PPE will be required. • No special permitting will be required prior to initiating field surveys. • No assessment of nearby architectural properties will be conducted • Any artifacts recovered from private land will be returned to the landowners. • Any artifacts recovered from public land may be subject to a curation agreement. Survey Methods for the archaeological survey will include: • Use of GPS devices during Phase I data collection and to provide UTM coordinates for all field datums, and site boundaries as needed. • Field methods and reporting format consistent with the Missouri Historic Preservation Office Archaeological Survey Standards.
AutoNDA by SimpleDocs
Phase I Archaeological Survey. USFWS shall ensure that a Phase I Scope of Work will be developed by Xxxxxx Ridge in consultation with SHPO. Phase I work will be designed to provide information regarding the significance of all identified archaeological sites to the NRHP. This work will be done in consultation with SHPO and all deliverables will be submitted by USFWS to SHPO for review and comment. 1) If USFWS determines and SHPO concurs that a “site is not eligible” for the NRHP, then no further investigations of that site will be conducted. 2) If USFWS determines and SHPO concurs that a site with indeterminable eligibility can and will be avoided, which would be the preferred option, then no further investigation of that site will be conducted, unless avoidance no longer becomes feasible.

Related to Phase I Archaeological Survey

  • Geological and archaeological finds It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.

  • Topographic Survey The Professional shall obtain a topographic and utility survey as described below. 4.1.1. The Professional shall tie in all existing surface topographic features and structures within the survey limits shown in Figure 1. This survey shall include: tops of curbs, edges of pavement, pavement materials, driveways, sidewalks, retaining walls, drainage structures (top, edges and flow line), channels and drainage ways (tops, toes and flow line), manholes (rim, flow lines and diameters of pipes, type of material and photographs of the inside of manholes and drainage structures), including the same survey data for upstream and downstream manholes and structures that are outside of the survey limits for all gravity wastewater and drainage lines within the survey limits. Visible valves, meters, clean-outs, slabs, utility signs, utility poles and structures, fences, landscaping features, shrubbery, trees (including the approximate drip-line), tree canopies, buildings (edges within the survey limits) mailboxes, etc. Trees shall be tagged and tabulated by size and species specific in compliance with the City of New Braunfels Tree Preservation ordinance as defined in the City of New Braunfels Zoning Ordinance Chapter 5.3- 5i. The survey limits shall extend approximately 100 feet on intersecting streets. The Professional shall provide sufficient ground shots to create one (1) foot contours for the Project. 4.1.2. The Professional shall conduct a utility survey and locate existing utilities within the Project boundary in Figure 1. The Professional shall contact all utility service providers by calling Texas 811 and the NBU Project Manager to coordinate flagging of existing franchise utilities. The Professional shall request drawings of existing agency and municipal owned utilities and shall include locations of these utilities in the survey. The Professional shall tie in the locations of the discovered utilities on the survey. The Professional shall bear all costs for the Services associated with utility locates. 4.1.3. The Professional shall locate up to ten (10) geotechnical borings and tie them in to the Project survey. 4.1.4. The Professional shall set and install control points and/or benchmarks as required for the survey work (minimum 1-foot intervals). The Professional shall provide horizontal and vertical coordinates of the benchmarks in the required coordinate system and datum and show the benchmarks on the survey drawing. 4.1.5. The Professional shall research and review adjoining plats and deeds along the survey corridor. The Professional shall locate property corners and identify existing right of way (“ROW”), along the survey corridor, based on found monuments and record documents.

  • Surveys Each Borrower shall submit the Ship owned by it regularly to all periodical or other surveys which may be required for classification purposes and, if so required by the Security Trustee provide the Security Trustee, with copies of all survey reports.

  • EU SURVEY 5.1. The participant shall complete and submit the online EU Survey after the mobility abroad within 30 calendar days upon receipt of the invitation to complete it.

  • Survey Buyer may obtain a survey of the Property before the Closing to assure that there are no defects, encroachments, overlaps, boundary line or acreage disputes, or other such matters, that would be disclosed by a survey ("Survey Problems"). The cost of the survey shall be paid by the Buyer. Not later than business days prior to the Closing, Buyer shall notify Seller of any Survey Problems which shall be deemed to be a defect in the title to the Property. Seller shall be required to remedy such defects within If Seller does not or cannot remedy any such defect(s), Buyer shall have the option of canceling this Agreement, in which case the Xxxxxxx Money shall be returned to Buyer.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Needs Assessment The determination of whether the Annual Income of a family or individual occupying or seeking to occupy a Qualifying Unit complies with the requirements for Extremely Low-Income Households or Low- to Moderate-Income Households shall be made by the applicable housing authority in the CDBG-DR Program area prior to admission of such family or individual to occupancy of a Qualifying Unit.

  • Geotechnical Investigation Perform in accordance with the City Design Manual and other City requirements as designated in writing by the Director.

  • Property Inspections The Servicer shall conduct property inspections in accordance with the milestones of the repair and rehabilitation plan for such Mortgaged Property and prepare Property Inspection Reports on any Mortgaged Property involving property damage over $15,000. The Servicer shall furnish a copy of the repair and rehabilitation plan for such Mortgaged Property to the Master Servicer upon request.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!