Photo-Electric Controls Sample Clauses

Photo-Electric Controls. The Contractor shall furnish all labor and material for the replacement of damaged, missing, or defective photoelectric controls. New controls shall be plugged into the luminaire receptacle or any other receptacle installation provided for that purpose. Long life Photo-Electric Controls, as per specification # 504 shall be used where there is an LED luminaire.
AutoNDA by SimpleDocs
Photo-Electric Controls. Where specified photocells shall be used to switch external lighting installations. Photo-electric switches shall be of the type comprising a photo-sensitive resistor, thermal actuator with an inherent operating delay to make it insensitive to short duration changes in light levels and a change-over switch mechanism, all housed within a tough, translucent, weather proof ultra violet stabilized cover. The operating level shall be factory preset to switch on at approximately 50 lux and off an approximately 100 lux. The response time after sudden changes in light level shall be not less than 15 seconds. Integral protection against voltage surges shall be provided. Photocells shall be positioned in such a way that they will not be affected by spill-light from the external lighting installation or by vehicle headlamps.

Related to Photo-Electric Controls

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Systems The details of any systems work will be determined after a thorough business analysis. System's work will be billed on a time and material basis. Investors Bank provides an allowance of 10 systems hours for data extract set up and reporting extract set up. Additional hours will be billed on a time and material basis.

  • Security Controls Annually, upon Fund’s reasonable request, DST shall provide Fund’s Chief Information Security Officer or his or her designee with a summary of its corporate information security policy and an opportunity to discuss DST’s information security measures, and a high level and non-confidential summary of any penetration testing related to the provision of in-scope services . DST shall review its Security Policy annually.

  • Technical Security Controls 35 a. Workstation/Laptop encryption. All workstations and laptops that store PHI COUNTY 36 discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of 37 COUNTY either directly or temporarily must be encrypted using a FIPS 140-2 certified algorithm which 1 is 128bit or higher, such as AES. The encryption solution must be full disk unless approved by the 2 COUNTY.

  • Science The content in the sequence of BSC 1010C and BSC 1011C is comparable to the standards for Biology 1 and therefore if both are completed may be used as preparation for the associated EOC.

  • Audit Controls a. System Security Review. CONTRACTOR must ensure audit control mechanisms that record and examine system activity are in place. All systems processing and/or storing PHI COUNTY discloses to CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY must have at least an annual system risk assessment/security review which provides assurance that administrative, physical, and technical controls are functioning effectively and providing adequate levels of protection. Reviews should include vulnerability scanning tools.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Electronic Access Access by the Customer to certain systems, applications or products of Bank shall be governed by this Agreement and the terms and conditions set forth in Annex A Electronic Access.

  • Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.