Unbundled Channelization (Multiplexing) 5.7.1 To the extent NewPhone is purchasing DS1 or DS3 or STS-1 Dedicated Transport pursuant to this Agreement, Unbundled Channelization (UC) provides the optional multiplexing capability that will allow a DS1 (1.544 Mbps) or DS3 (44.736 Mbps) or STS-1 (51.84 Mbps) Network Elements to be multiplexed or channelized at a BellSouth central office. Channelization can be accomplished through the use of a multiplexer or a digital cross-connect system at the discretion of BellSouth. Once UC has been installed, NewPhone may request channel activation on a channelized facility and BellSouth shall connect the requested facilities via COCIs. The COCI must be compatible with the lower capacity facility and ordered with the lower capacity facility. This service is available as defined in NECA 4. 5.7.2 BellSouth shall make available the following channelization systems and interfaces: 5.7.2.1 DS1 Channelization System: channelizes a DS1 signal into a maximum of twenty- four (24)
Fabrication Making up data or results and recording or reporting them.
Combination Products If a LICENSED PRODUCT is sold to any third party in combination with other products, devices, components or materials that are capable of being sold separately and are not subject to royalties hereunder (“OTHER PRODUCTS,” with the combination of products being referred to as “COMBINATION PRODUCTS” and the Other Product and Licensed Product in such Combination Product being referred to as the “COMPONENTS”), the NET SALES of such LICENSED PRODUCT included in such COMBINATION PRODUCT shall be calculated by multiplying the NET SALES of the COMBINATION PRODUCT by the fraction A/(A+B), where A is the average NET SALES price of such LICENSED PRODUCT in the relevant country, as sold separately, and B is the total average NET SALES price of all OTHER PRODUCTS in the COMBINATION PRODUCT in the relevant country, as sold separately. If, in any country, any COMPONENT is not sold separately, NET SALES for royalty determination shall be determined by the formula [C / (C+D)], where C is the aggregate average fully absorbed cost of the Licensed Product components during the prior Royalty Period and D is the aggregate average fully absorbed cost of the other essential functional components during the prior Royalty Period, with such costs being determined in accordance with generally accepted accounting principles. To the extent that any SUBLICENSE INCOME relates to a COMBINATION PRODUCT or is otherwise calculated based on the value of one or more licenses or intellectual property rights held by the COMPANY, an AFFILIATE or SUBLICENSEE, COMPANY shall determine in good faith and report to THE PARTIES the share of such payments reasonably attributable to COMPANY’s or such AFFILIATE’s sublicense of the rights granted hereunder, based upon their relative importance and proprietary protection, which portion shall be the SUBLICENSE INCOME. THE PARTIES shall have the right to dispute such sharing determination in accordance with the dispute provisions of the AGREEMENT.
Combination Product The term “
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.
Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.
Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Fixed Kilowatt Rate Product If Clearview Energy would like to propose a change to a fixed kilowatt rate product, you will be notified by the process described in Change of Terms. Fixed price products may change due to new or modified federal, state or local laws; or regulatory actions that impose new or modified fees. 2b. Month-to-month Variable Kilowatt Rate Product – Month-to-month variable kilowatt rate products are subject to change without notice at Clearview Energy’s discretion outside of any applicable promotion. If applicable, the Monthly Base Charge may also fluctuate outside of any applicable promotion. All pricing can be viewed at xxx.XxxxxxxxxXxxxxx.xxx.