PIPELINE GRADE Sample Clauses

PIPELINE GRADE. 1. The Contractor shall employ competent personnel or an independent licensed Civil Engineer acceptable to the Engineer who shall be responsible for accurately transferring lines and grades to the bottom of trenches or excavations for the construction of pipelines and structures. This requirement does not apply to sewers which are pipe burst. 2. All pipelines shall be laid true to line and grade. Pipe alignment shall reasonably conform to that shown on the plans, and in no event shall joint deflections exceed the pipe manufacturer's recommendations. The grade of all gravity sewers shall be within ±0.05 foot of the elevations and grades shown on the plans with the provision that in no event shall a gravity sewer or drain be allowed to have a sag or standing water greater than 0.10 feet deep in ten (10) inches or smaller inside diameter pipe and 0.20 feet in pipe larger than ten (10) inches inside pipe diameter. Pipeline grades which exceed this standard as determined by the television inspection to be performed by the Contractor shall be relaid at no expense to the City. This requirement does not apply to sewers which are pipe burst. 3. Excavation for pipelines to be installed by trenching shall conform to City Standard Detail SS 4, “Typical Trench Detail” except that a locator and plastic metallic detection tape shall not be required.
AutoNDA by SimpleDocs

Related to PIPELINE GRADE

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Voice Grade Either an analog signal of 300 to 3000 Hz or a digital signal of 56/64 kilobits per second. When referring to digital Voice Grade service (a 56-64 kbps channel), the terms "DS0" or "sub-DS1" may also be used.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Industry Ratings The City will only accept coverage from an insurance carrier who offers proof that it: a. Is authorized to do business in the State of Kansas; b. Carries a Best's policyholder rating of A- or better; and c. Carries at least a Class VIII financial rating; or d. Is a company mutually agreed upon by the City and Consulting Engineer/Architect.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Underground Storage Tanks In accordance with the requirements of Section 3(g) of the D.C. Underground Storage Tank Management Act of 1990, as amended by the District of Columbia Underground Storage Tank Management Act of 1990 Amendment Act of 1992 (D.C. Code § 8-113.01, et seq.) (collectively, the “UST Act”) and the applicable D.C. Underground Storage Tank Regulations, 20 DCMR Chapter 56 (the “UST Regulations”), District hereby informs the Developer that it has no knowledge of the existence or removal during its ownership of the Property of any “underground storage tanks” (as defined in the UST Act). Information pertaining to underground storage tanks and underground storage tank removals of which the D.C. Government has received notification is on file with the District Department of the Environment, Underground Storage Tank Branch, 00 X Xxxxxx, X.X., Xxxxx Xxxxx, Xxxxxxxxxx, X.X., 00000, telephone (000) 000-0000. District’s knowledge for purposes of this Section shall mean and be limited to the actual knowledge of Xxxxxx Xxxxx, Property Acquisition and Disposition Division of the Department of Housing and Community Development, telephone no. (000) 000-0000. The foregoing is set forth pursuant to requirements contained in the UST Act and UST Regulations and does not constitute a representation or warranty by District.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None (2) In the event that, in accordance with the Interconnection Construction Service Agreement, Interconnection Customer has exercised the Option to Build, it is hereby permitted to build in accordance with and subject to the conditions and limitations set forth in that Section, the following portions of the Transmission Owner Interconnection Facilities which constitute or are part of the Customer Facility: None Ownership of the facilities built by Interconnection Customer pursuant to the Option to Build shall be as provided in the Interconnection Construction Service Agreement.