Planting and Backfilling Bare-Root Plants Sample Clauses

Planting and Backfilling Bare-Root Plants. 3.6.2.1 Prepared backfill soil shall be placed in the plant pit to required minimum depth and very slightly tamped. Plants shall then be placed in the center of the pit and roots properly spread out in a natural position. All broken or damaged roots shall be cleanly cut back to sound root growth.
AutoNDA by SimpleDocs

Related to Planting and Backfilling Bare-Root Plants

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Mastectomy Services Inpatient This plan provides coverage for a minimum of forty-eight (48) hours in a hospital following a mastectomy and a minimum of twenty-four (24) hours in a hospital following an axillary node dissection. Any decision to shorten these minimum coverages shall be made by the attending physician in consultation with and upon agreement with you. If you participate in an early discharge, defined as inpatient care following a mastectomy that is less than forty-eight (48) hours and inpatient care following an axillary node dissection that is less than twenty-four (24) hours, coverage shall include a minimum of one (1) home visit conducted by a physician or registered nurse.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Infrastructure Improvements The design, redevelopment and construction and completion of certain infrastructure improvements, including sewer, stormwater, electrical and water main improvements, along with other similar improvements.

Time is Money Join Law Insider Premium to draft better contracts faster.