Power and Auxiliary Transformers. The Facility shall include a main transformer for each generator, together with all protection, busbars and disconnectors where required. These main transformers shall be equipped with on-load tap changers and shall be of OFAF (forced oil, forced air) or ODAF (oil direct, forced air cooled) type rated for the full continuous output of the generator with sufficient margin. All service station auxiliary transformers shall be OFAF, ODAF or ONAN cooled if located outside, or resin type design if situated inside the buildings.
AutoNDA by SimpleDocs

Related to Power and Auxiliary Transformers

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 33.6

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • PLANT CLOSURE 29.01 In the event the Company closes the plant at the Cambridge location as a result of the loss of business or a discontinuation of all operations, severance pay will be calculated at one (1) week’s regular pay per year of service. The severance payment, so calculated, is inclusive of any severance payment required by the Ontario Employment Standards Act (Revised 2000). This agreement is not applicable to a sale of the business or if the closure is occasioned by a labour dispute.

  • Gas If Customer has selected a Gas Fixed Rate, Customer’s Price will be based on the Fixed Rate(s), plus the Administration Charge, set forth in the Application, which includes RITERATE ENERGY’s compressor fuel and transportation charges, administrative and transaction costs and the Gas Balancing Amount and any Regulatory Charges (defined below).

  • Electrical Power Corporation shall provide Contractor with convenient access to electrical power required to perform the work. The electrical outlets used by Contractor shall be those designated or approved by Corporation.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the end-user’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the end-user and the cross-box.