Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.
ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.
Electrical Service Subject to the limitation of this Paragraph 4, furnish electrical service to the Premises, including providing and installing all Building standard replacement lighting tubes. If Tenant uses more electrical power than Landlord in good faith considers reasonable or normal for office use, Tenant will pay Landlord on a monthly basis the cost of such excess power consumed by Tenant. Consumption will be determined, at Landlord’s election, either (a) by a survey performed by a reputable consultant selected by Landlord, or (b) through separate meters or submeters installed, maintained and read by Landlord at Tenant’s cost. For purposes of this Paragraph 4 only, “month” and “monthly” shall mean any billing period used by the utility or other power provider supplying electricity. All installations of electrical futures, appliances and equipment within the Premises shall be subject to Landlord’s prior approval, and if they affect the temperature or humidity otherwise maintained, Landlord may, at Tenant’s sole cost and expense (to be paid within (30) days after delivery of written demand supported by invoices or other reasonably satisfactory evidence), install supplemental air conditioning units. Tenant’s use of electricity shall never exceed Tenant’s share of the capacity of existing feeders to the Building or of the risers, wiring installations and transformers serving the floor(s) containing the Premises. Landlord shall provide up to 3.5 xxxxx per usable square foot (demand) of riser and floor panel electrical capacity averaged over the floor being serviced. EXHIBIT C Tenant shall be allocated an approximate 2.0 xxxxx per usable square foot for power and 1.5 xxxxx per usable square foot for lighting. Any risers or wiring necessary to meet Tenant’s excess electrical requirements will be installed by Landlord on Tenant’s request, at Tenant’s sole cost and expense (to be paid in advance), but only if in Landlord’s reasonable good faith belief they are necessary and will not cause damage to the Building or a dangerous condition, entail excessive or unreasonable alterations, repairs or expense, or disturb other occupants.
Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.
Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.
Delivery Point Once Manufacture of the Products has been completed, Contractor shall be responsible for delivering the Finished Goods FCA, (as defined in Incoterms (2000) published by the International Chamber of Commerce) and to a freight forwarder specified by Company in its Order, or otherwise approved by Company. “Delivery Point” as used in this Agreement shall mean the specific time and location that the Product is delivered to the shipper specified on the Order.
Utility Services The Owner represents that, to the best of its knowledge, all utility services required to construct and operate the Project (including, without limitation, public water, sewer and electricity) are currently available to the Property in the capacities required to operate the Project. No work need be performed by or on behalf of the Developer to make such utilities available to the Property for the construction or operation of the Project, except for the matters, if any, set forth on Exhibit "D". Copies of letters from the providers of such utility services confirming such availability are annexed hereto as Exhibit "G".
Emergency Generator Tenant shall have the right to tie into and use the emergency generator to be installed by Landlord as part of the Base Building Work for use by tenants of the Unit (the “Unit Generator”). Tenant shall be responsible, at its sole cost and expense, for installing, maintaining, repairing and replacing its connection between the Premises and the Unit Generator, and all associated cabling. Tenant shall be permitted to use up to an average of three (3) xxxxx per square foot of usable area in the Premises from the Unit Generator, and at no time shall Tenant exceed that use limitation with respect to the Unit Generator. Except to the extent that Tenant ties into the Unit Generator as part of the Initial Tenant Work in accordance with the provisions of the Work Letter, installation of such tie-in and any related cabling, conduit and appurtenances will be governed by the applicable provisions of this Lease relating to Tenant Work. Tenant will submit to Landlord at least thirty (30) days prior to the proposed installation date Tenant’s proposed plans and specifications relating to the tie-in to the Unit Generator and all associated lines. Tenant may not commence any work to tie into the Unit Generator until it has received Landlord’s prior written approval (not to be unreasonably withheld, delayed or conditioned) of such plans and specifications. Tenant, at its sole cost and expense, shall comply with all applicable Legal Requirements and Title Matters and Landlord’s reasonable directives relating to the installation, operation, maintenance and repair of such tie-in, including (i) obtaining and maintaining (or causing to be obtained and maintained) and complying with the provisions of all applicable permits relating to the tie into and use of the Unit Generator. Tenant may not use the Unit Generator for any purpose other than solely in connection with Tenant’s occupancy of the Premises for the Permitted Use and in accordance with any applicable permit(s) pertaining to the Unit Generator. Except for permitted subtenants and assignees. Tenant may not use the Unit Generator to serve other occupant(s) of the Development.
Information Systems Acquisition Development and Maintenance a. Client Data – Client Data will only be used by State Street for the purposes specified in this Agreement.
ADJACENT EXCAVATION-SHORING 32. If an excavation shall be made upon land adjacent to the demised premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the demised premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which demised premises form a part from injury or damage and to support the same by proper foundations without any claim for damages or indemnity against Owner, or diminution or abatement of rent.