Common use of Preparation of Subgrade Clause in Contracts

Preparation of Subgrade. The Contractor shall remove loam and topsoil, loose vegetable matter, stumps, large roots, etc., from areas upon which embankments will be built or material will be placed for grading. The subgrade shall be shaped as indicated on the drawings and shall be so prepared by forking, furrowing, or plowing that the first layer of the new material placed thereon will be well bonded to it. Placing and Compacting Embankment Material. After the subgrade has been prepared as hereinbefore specified, the material shall be placed thereon and built up in successive layers until it has reached the required elevation. Layers shall not exceed 12 inches in thickness before compaction. In embankments at structures, the layers shall have a slight downward slope away from the structure; in other embankments the layers shall have a slight downward slope away from the center. In general, the finer and less previous materials shall be placed against the structures or in the center, and the coarser and more pervious materials, upon the outer parts of embankments. Each layer of material shall be compacted by the use of approved rollers or other approved means so as to secure a dense, stable, and thoroughly compacted mass. At such points as cannot be reached by mobile mechanical equipment, the materials shall be thoroughly compacted by the use of suitable power-driven tampers. Previously placed or new materials shall be moistened by sprinkling, if required, to ensure proper bond and compaction. No compacting shall be done when the material is too wet, from either rain or too great an application of water, to compact it properly; at such times the work shall be suspended until the previously placed and new materials have dried out sufficiently to permit proper compaction, or such other precautions shall be taken as may be necessary to obtain proper compaction. The portion of embankment constructed below proposed structures shall be compacted to 95 percent. The top two feet of an embankment below a pavement base shall be compacted to 95 percent. All other embankments shall be compacted to 90 percent.

Appears in 4 contracts

Samples: Agreement, Agreement, Elevator Constructors

AutoNDA by SimpleDocs

Preparation of Subgrade. The Contractor shall remove loam and topsoil, loose vegetable matter, stumps, large roots, etc., from areas upon which embankments will be built or material will be placed for grading. The subgrade shall be shaped as indicated on the drawings and shall be so prepared by forking, furrowing, or plowing that the first layer of the new material placed thereon will be well bonded to it. Placing and Compacting Embankment Material. After the subgrade has been prepared as hereinbefore specified, the material shall be placed thereon and built up in successive layers until it has reached the required elevation. Layers shall not exceed 12 inches in thickness before compaction. In embankments at structures, the layers shall have a slight downward slope away from the structure; in other embankments the layers shall have a slight downward slope away from the center. In general, the finer and less previous materials shall be placed against the structures or in the center, and the coarser and more pervious materials, upon the outer parts of embankments. Each layer of material shall be compacted by the use of approved rollers or other approved means so as to secure a dense, stable, and thoroughly compacted mass. At such points as cannot be reached by mobile mechanical equipment, the materials shall be thoroughly compacted by the use of suitable power-driven tampers. Previously placed or new materials shall be moistened by sprinkling, if required, to ensure proper bond and compaction. No compacting shall be done when the material is too wet, from either rain or too great an application of water, to compact it properly; at such times the work shall be suspended until the previously placed and new materials have dried out sufficiently to permit proper compaction, or such other precautions shall be taken as may be necessary to obtain proper compaction. The portion of embankment constructed below proposed structures shall be compacted to 95 percent. The top two feet of an embankment below a pavement base shall be compacted to 95 percent. All other embankments shall be compacted to 90 percent.. Item 5 Processed Gravel Base 5.1 General 5.2 Processed Gravel

Appears in 1 contract

Samples: greenfield-ma.gov

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.