Prior Approval of Plans & Specifications Required Sample Clauses

Prior Approval of Plans & Specifications Required. The Contractor shall submit to the CVB, for approval, schematic designs, design development drawings, and final working drawings and specifications for the construction on the Facilities of any additional improvements, additions, and alterations to convert the Facilities to the condition desired by the Contractor for the operation of its business. All improvements, additions, and alterations shall be subject to the CVB’s site standards and related review procedures. All such designs, drawings, and plans for work affecting, in any way, the structural, mechanical, or electrical systems of the buildings of which the Facilities form a part or having a cost in excess of Two Thousand Dollars ($2,000) shall be prepared by a licensed architect or engineer, who shall have affixed to the same his/her signature and seal. No change shall be made to any electrical wiring or plumbing in the Facilities or any utility service to or from the Facilities as of the commencement date of this Contract and at any time subsequent thereto, other than a change made by a properly-licensed electrician or plumber. No demolition, remodeling, or construction work shall begin on any improvement, addition, or alteration on the Facilities or to any utility service connection with the Facilities or any portion thereof, or to any other CVB facility, until after the Designee has approved the same and all other required authorizations have been secured for such work. If any improvement, addition, or alteration to the Facilities is begun, the portion of the Facilities that is subjected to such change must be made accessible for disabled people as required by applicable law.
AutoNDA by SimpleDocs

Related to Prior Approval of Plans & Specifications Required

  • ROAD WORK PHASE APPROVAL Purchaser shall obtain written approval from the Contract Administrator upon completion of each of the following phases of road work:  Drainage installation  Subgrade compaction  Rock compaction SUBSECTION RESTRICTIONS

  • Class Specifications The Human Resources Division shall determine:

  • Prior Approval Required Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of LAFCO. Subcontracts, if any, shall contain a provision making them subject to all provisions stipulated in this Agreement.

  • Prior Approval The Engineer shall not assign, subcontract or transfer any portion of professional services related to the work under this contract without prior written approval from the State.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • FAA APPROVAL This Agreement may be subject to approval of the FAA. If the FAA disapproves this Agreement, it will become null and void, and both Parties will bear their own expenses relative to this Agreement, up to the date of disapproval.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Prior Approvals This Contract shall not be binding unless and until all requisite prior approvals have been obtained in accordance with current State law, bulletins, and interpretations.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Project Implementation Manual The Recipient, through the PCU, shall: (i) take all action required to carry out Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4 (ii) of the Project in accordance with the provisions and requirements set forth or referred to in the Project Implementation Manual; (ii) submit recommendations to the Association for its consideration for changes and updates of the Project Implementation Manual as they may become necessary or advisable during Project implementation in order to achieve the objective of Parts 1.1, 1.3, 1.4, 2, 3.1(b), 3.2, 3.3 and 4(ii) of the Project; and (iii) not assign, amend, abrogate or waive the Project Implementation Manual or any of its provisions without the Association’s prior agreement. Notwithstanding the foregoing, if any of the provisions of the Project Implementation Manual is inconsistent with the provisions of this Agreement, the provisions of this Agreement shall prevail and govern.

Time is Money Join Law Insider Premium to draft better contracts faster.