Procedure Components Sample Clauses

Procedure Components. The four basic components of the PCO Procedures include: 1) identifying stakeholder groups based on levels of project involvement, 2) specifying communication methods, tools and timing for project information dissemination, 3) attributing the appropriate communication methods to be used for identified stakeholder groups, and 4) implementation and adherence to the resulting plan.
AutoNDA by SimpleDocs

Related to Procedure Components

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Software Components At any time during the contract period of performance, the Government may require the Contractor to remedy any failure of the software to comply with the requirements of this contract. Support shall consist of correction of errors, provision of modifications, improvements, and other products the original manufacturer makes available to the Government without charge. The Government shall also be provided full documentation of changes and/or modifications to the software provided to meet the Government's requirements.

  • Drug Testing Procedures a. The testing procedures and safeguards provided in this policy shall be adhered to by any laboratory personnel administering departmental drug tests.

  • Testing Procedure A. For alcohol testing, the member shall be first given a breath test, at the collection site, followed by a confirmatory urine test only where the breath test reveals an initial positive alcohol level of .04 grams per 210 l. of breath. If the initial breath test results are below this level, testing shall be discontinued; if confirmatory urine tests results are below a level equivalent to .04 grams per 210 l. of breath, the confirmatory test shall be considered negative.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • COVID-19 Protocols Contractor will abide by all applicable COVID-19 protocols set forth in the District’s Reopening and COVID-19 Mitigation Plan and the safety guidelines for COVID-19 prevention established by the California Department of Public Health and the Ventura County Department of Public Health.

  • Treatment Program Testing The Employer may request or require an employee to undergo drug and alcohol testing if the employee has been referred by the employer for chemical dependency treatment or evaluation or is participating in a chemical dependency treatment program under an employee benefit plan, in which case the employee may be requested or required to undergo drug or alcohol testing without prior notice during the evaluation or treatment period and for a period of up to two years following completion of any prescribed chemical dependency treatment program.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

  • GMP The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est. COW): $ CM/GC Fee ( % of Est. COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC’s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

Time is Money Join Law Insider Premium to draft better contracts faster.