Procedure for Approval of Detailed Project Report Sample Clauses

Procedure for Approval of Detailed Project Report a) NRDA may constitute a committee comprising representatives from various government departments / agencies for review and approval of the DPR (the “Co-ordination Committee”). Within 30 days of receipt of the DPR, NRDA shall in consultation with Co-ordination Committee, review the DPR and either approve or shall convey its comments/observation, if any, on the DPR. Within 30 days of receipt of such comments/observation from NRDA, the Developer shall finalize the DPR taking into account the comments and observation by NRDA. The DPR shall be finalized with mutual consent of the Parties (“Approved DPR”). The entire Project shall be developed and implemented in conformity to the Approved DPR.
AutoNDA by SimpleDocs

Related to Procedure for Approval of Detailed Project Report

  • PROCEDURE FOR APPROVAL OF SETTLEMENT 28. Acceptance of this Settlement Agreement shall be sought at a hearing of the Central Regional Council of the MFDA on a date agreed to by counsel for Staff and the Respondent.

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Implementation Report Within 150 days after the Effective Date, Extendicare shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include:

  • REGULATORY FILINGS AND CAISO TARIFF COMPLIANCE 3.1 Filing

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • NOTIFICATIONS AND SUBMISSION OF REPORTS Unless otherwise stated in writing after the Effective Date, all notifications and reports required under this IA shall be submitted to the following entities: OIG: Administrative and Civil Remedies Branch Office of Counsel to the Inspector General Office of Inspector General U.S. Department of Health and Human Services Xxxxx Building, Room 5527 000 Xxxxxxxxxxxx Xxxxxx, XX Xxxxxxxxxx, XX 00000 Telephone: (000) 000-0000 Facsimile: (000) 000-0000 LFAC: Xxxxxxx X. Xxxxx, DPM 0000 Xxxxxxxxxxx Xx. X-000 Xxxxxxxxx, XX 00000 Telephone: (000) 000-0000 Email: xx.xxxxx@xxxxx.xxx Unless otherwise specified, all notifications and reports required by this IA may be made by electronic mail, overnight mail, hand delivery, or other means, provided that there is proof that such notification was received. Upon request by OIG, LFAC may be required to provide OIG with an additional copy of each notification or report required by this IA in OIG’s requested format (electronic or paper).

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Application for approval 3.1. The application for approval of a vehicle type with regard to braking shall be submitted by the vehicle manufacturer or by his duly accredited representative.