Process Engineer–Water Treatment Plant (National) Sample Clauses

Process Engineer–Water Treatment Plant (National). Process Engineer – Water Treatment Plant will be responsible for design of municipal Water treatment plant, review and approval of designs/ drawings/ details submitted by contractor, identification and appraisal of subproject for subsequent tranches, assist in contract management and performance monitoring, ensure the progress and quality of construction activities, assist in commissioning of water treatment plants (WTP), ensure correctness of as-built drawings and operational manuals, establish operation and maintenance (O&M) procedures and capacity building and training, contribute for preparing Project Completion Report. Process Engineer – Water Treatment Plant shall preferably i) be Graduate Civil/ Engineer and Post-graduation in PHE/ Chemical Engineering, ii) have Experience of 10 years in design, construction and O&M of municipal Water treatment plants, and iii) sound knowledge of ADB procedures/ policies, Contract management, Construction supervision and design of municipal Water treatment plants with using innovative technologies shall be preferred. Experience in externally funded projects shall have added advantage.
AutoNDA by SimpleDocs

Related to Process Engineer–Water Treatment Plant (National)

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Procurement Plan 8. The Borrower shall update the Procurement Plan as needed throughout implementation of the Project, and on each anniversary of the Effective Date, the Borrower shall in consultation with ADB determine whether the Procurement Plan needs to be updated. The Borrower shall implement the Procurement Plan in the manner in which it has been approved by ADB.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Specialty Prescription Drugs (+ Prorated copayments for a shorter supply period may apply for network pharmacy only. See Prescription Drug section for details. When purchased at a Specialty Pharmacy (+): For maintenance and non-maintenance prescription drugs, a copayment applies for each 30-day period (or portion thereof) within the prescribeddosing period. Tier 5: $125 Not Covered When purchased at a Retail Pharmacy (+): For maintenance and non-maintenance prescription drugs, a copayment applies for each 30-day period (or portion thereof) within the prescribeddosing period. Specialty Prescription Drugs purchasedat a retail pharmacy will require a significantly higher out of pocket expense than if purchased from a Specialty Pharmacy. Our reimbursement is based on the pharmacy allowance. Tier 5: 50% Not Covered When purchased at a Mail Order Pharmacy: Not Covered Not Covered Covered Benefits Network Pharmacy Non-network Pharmacy (+) Preauthorization is required for thisservice. Please see Preauthorization in Section 3 for more information. You Pay You Pay Infertility Prescription Drugs - Three(3) in-vitro cycles will be covered per plan year with a total of eight (8) in-vitro cycles covered in a member’s lifetime. When purchased at a Specialty, Mail Order, or Retail Pharmacy Tier 1: 20% Not Covered Tier 2: 20% Not Covered Tier 3: 20% Not Covered Tier 4: 20% Not Covered When purchased at a Specialty Pharmacy (+) Tier 5: 20% Not Covered When purchased at a Retail Pharmacy (+): Specialty Prescription Drugs purchased at a retail pharmacy will require a significantly higher out of pocket expense than if purchased from a specialty pharmacy. Tier 5: 20% Not Covered Contraceptive Methods- Preventive Coverage includes barrier method (diaphragmor cervical cap), hormonal method (birth control pill), and emergency contraception. For non-preventive contraceptive prescription drugs and devices, the amount you pay will depend on the tier placement of the contraceptive prescription drug or device. See above for details. When purchased at a Retail Pharmacy: Up to a 365-day supply of contraceptive prescription drugs is available at all network retail pharmacies. For more information about this option, visit our website. Tier 1: $0 Not Covered When purchased at a Mail Order Pharmacy: Up to a 90-day supply. Tier 1: $0 Not Covered

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.