Project Bidding and Construction Strategy Sample Clauses

Project Bidding and Construction Strategy. The CM shall, in conjunction with the Owner's Representative and other staff of the District, review the current status of completion and approvals for bidding the Project Design Documents to Trade Contractors. The objective of these reviews is the development of an overall strategy for bidding and constructing the District Project taking into account factors affecting time for completing construction of the District Project or the costs of constructing the Project. The CM shall conduct such interviews and participate in such meetings and conferences with the Architect, Owner's Representatives, the Owner's staff and others as necessary to develop a bidding and construction strategy consistent with the Owner's Project objectives. The CM shall submit its written recommended bidding/construction strategy to the Owner for their acceptance within twenty (20) calendar days, or such other time as mutually agreed by the parties, of the date of this Agreement ("the Preliminary Bidding/Construction Strategy"). Within seven (7) calendar days, or such other time as mutually agreed by the parties, of the Owner's Representatives' receipt of the CM's Preliminary Bidding/Construction Strategy, the Owner will submit comments, modifications and other direction to the CM relating to the CM's Preliminary Bidding/Construction Strategy. The CM shall modify the Preliminary Bidding/Construction Strategy as necessary to obtain acceptance of the Owner. Modifications, if any, to the CM's proposed bidding/construction strategy shall be completed within five (5) calendar days, or such other time as mutually agreed by the parties, of the CM's receipt of written communication from the Owner regarding modifications necessary to obtain the Owner's acceptance of the CM's bidding/construction strategy; the modification process shall continue until the Owner has accepted the entirety of the CM's proposed bidding construction strategy ("the Final Bidding/Construction Strategy"). The CM shall implement the Final Bidding/ Construction Strategy.
AutoNDA by SimpleDocs

Related to Project Bidding and Construction Strategy

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

Time is Money Join Law Insider Premium to draft better contracts faster.