Project Site Requirements Sample Clauses

Project Site Requirements. (a) As part of its obligations under this Agreement, Developer shall provide each of the following activities during the Term:
AutoNDA by SimpleDocs
Project Site Requirements. A. No smoking shall be allowed on site B. No abusive or inappropriate language will be tolerated

Related to Project Site Requirements

  • ON SITE REQUIREMENTS While on Purchaser’s premises, Contractor, its agents, employees, or subcontractors shall comply, in all respects, with Purchaser’s physical, fire, access, safety, and other security requirements.

  • Space Requirements The Construction Administrator will conduct a review of the adequacy of space allotments for maintenance of mechanical, telephone, and fire protection equipment.

  • PRUDENTIAL REQUIREMENTS 12.1 Retailer will satisfy prudential requirements: If required by a notice from the Distributor, the Retailer will comply with either one of the following prudential requirements within 10 Working Days of receipt of the Distributor's notice:

  • Maintenance Requirements The Contractor shall ensure and procure that at all times during the Maintenance Period, the Project Highway conforms to the maintenance requirements set forth in Schedule-E (the “Maintenance Requirements”).

  • DBE Requirements A. Notice is hereby given to the CONSULTANT and any SUB-CONSULTANT, and both agree, that failure to carry out the requirements set forth in 49 CFR Sec. 26.13(b) shall constitute a breach of this Contract and, after notification and failure to promptly cure such breach, may result in termination of this Contract or such remedy as INDOT deems appropriate. The referenced section requires the following assurance to be included in all subsequent contracts between the CONSULTANT and any SUB-CONSULTANT: The CONSULTANT, sub recipient or SUB-CONSULTANT shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy, as INDOT, as the recipient, deems appropriate.

  • VEHICLE REQUIREMENTS The following shall be considered minimum Vehicle requirements. The Authorized User shall include supplemental required specifications for Vehicles specified in a Mini-Bid. Unless otherwise indicated, all items specified which are listed on the OEM Pricelist as standard or optional equipment shall be factory installed and operative. Vehicles delivered to an Authorized User in a condition considered to be below retail customer acceptance levels will not be accepted. Items which determine this acceptance level shall include, but not be limited to, the general appearance of the interior and exterior of the vehicle for completeness and quality of workmanship, lubrication and fluid levels, with any leaks corrected, mechanical operation of the vehicle and all electrical components operational. Product specified to be furnished and installed which is not available through the OEM shall conform to the standards known to that particular industry, both product and installation.

  • Interface Requirements 9.3.1 BellSouth shall offer LIDB in accordance with the requirements of this subsection.

  • Schedule Requirements The Contractor shall submit an electronic and a paper copy of the initial Work Progress Schedule reflecting accurate and reliable representations of the planned progress of the Work, the Work to date if any, and of the Contractor’s actual plans for its completion. The Contractor shall organize and provide adequate detail so the Work Progress Schedule is capable of measuring and forecasting the effect of delaying events on completed and uncompleted activities.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.