Proposition C 529a Sample Clauses

Proposition C 529a. A. The parties recognize the requirement under Charter Section A8.409-9 to negotiate cost-sharing provisions that produce comparable savings and costs to the City and County as are produced through the Charter's SFERS employee contribution rate adjustment formulae. The parties intend this Section to effectuate the cost sharing provisions of San Francisco Charter Section A8.409-9. The parties further acknowledge that: (i) the annual SFERS employer contribution rate is determined by the SFERS actuary and approved by the SFERS Board for each fiscal year; and (ii) the annual employer contribution rate for SFERS for FY 2012-13 is 20.71%.
AutoNDA by SimpleDocs

Related to Proposition C 529a

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Background and Narrative of Budget Reductions 2. Assumptions Used in the Deficit Reduction Plan: - EBF and Estimated New Tier Funding: - Equal Assessed Valuation and Tax Rates: - Employee Salaries and Benefits: - Short and Long Term Borrowing: - Educational Impact: - Other Assumptions: - Has the district considered shared services or outsourcing (Ex: Transportation, Insurance) If yes please explain: ESTIMATED LIMITATION OF ADMINISTRATIVE COSTS (School Districts Only) (For Local Use Only)

  • Proposed Corrective Action Plan Simultaneously with the submission of the Audit, the Recipient will submit to OCR for its review and approval a proposed Corrective Action Plan to address all inaccessible content and functionality identified during the Recipient’s Audit. The proposed Corrective Action Plan will set out a detailed schedule for: (1) addressing problems, taking into account identified priorities, with all corrective actions to be completed within 18 months of the date OCR approved the Corrective Action Plan; (2) setting up systems of accountability and verifying claims of accessibility by vendors or open sources; and setting up a system of testing and accountability to maintain the accessibility of all online content and functionality on an ongoing basis.

  • Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that:

  • Prescription Drug Quantity Limits We limit the quantity of certain prescription drugs that you can get at one time for safety, cost-effectiveness and medical appropriateness reasons. Our clinical criteria for quantity limits are subject to our periodic review and modification. Quantity limits may restrict: • the amount of pills dispensed per thirty (30) day period; • the number of prescriptions ordered in a specified time period; or • the number of prescriptions ordered by a provider, or multiple providers. Our formulary indicates which prescription drugs have a quantity limit. Types of Pharmacies Prescription drugs and diabetic equipment or supplies can be bought from the following types of pharmacies: • Retail pharmacies. These dispense prescription drugs and diabetic equipment or supplies. • Mail order pharmacies. These dispense maintenance and non-maintenance prescription drugs and diabetic equipment or supplies. • Specialty pharmacies. These dispense specialty prescription drugs, defined as such on our formulary. For information about our network retail, mail order, and specialty pharmacies, visit our website or call our Customer Service Department.

  • Removal After Your Tax Filing Deadline If you are correcting an excess contribution after your tax filing deadline, including extensions, remove only the amount of the excess contribution. The six percent excess contribution penalty tax will be imposed on the excess contribution for each year it remains in the IRA. An excess withdrawal under this method will only be taxable to you if the total contributions made in the year of the excess exceed the annual applicable contribution limit.

  • EQUIPMENT TAX ASSESSMENT 17.1 Any bid for public improvement shall comply with Nebraska Revised Statutes Section 77-1323 and 77-1324. Indicating; every person, partnership, limited liability company, association or corporation furnishing labor or material in the repair, alteration, improvement, erection, or construction of any public improvement shall sign a certified statement which will accompany the contract. The certified statement shall state that all equipment to be used on the project, except that acquired since the assessment date, has been assessed for taxation for the current year, giving the county where assessed.

  • Action Item Task MSU Status Comments I.1 The University will employ and empower a Clery Act compliance professional (CCP). The CCP must report to a Vice President (VP) or equivalent. The CCP must not be employed in or under the sole authority of the Office of the General Counsel (OGC). Implemented The Office of Audit, Risk and Compliance (OARC) hired a qualified candidate who began work in February 2020.

  • Phase I a. In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

Time is Money Join Law Insider Premium to draft better contracts faster.