Publications/Dissemination of Project knowledge Sample Clauses

Publications/Dissemination of Project knowledge. In addition to dissemination activities (ruled by the Plan for dissemination and promotion activities) and to contractual Deliverable, the Project is also expected to generate a substantial amount of publications destined for groups not directly participating in the Project and for the general public.
AutoNDA by SimpleDocs

Related to Publications/Dissemination of Project knowledge

  • Application and Submission Information In addition to the application and submission language discussed in PART II: Section I, you must include the following in your application:

  • Root-­‐zone Information Publication ICANN’s publication of root-­‐zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • zone Information Publication ICANN’s publication of root-zone contact information for the TLD will include Registry Operator and its administrative and technical contacts. Any request to modify the contact information for the Registry Operator must be made in the format specified from time to time by ICANN at xxxx://xxx.xxxx.xxx/domains/root/.

  • Dissemination of Information The Borrower authorizes each Lender to disclose to any Participant or Purchaser or any other Person acquiring an interest in the Loan Documents by operation of law (each a "Transferee") and any prospective Transferee any and all information in such Lender's possession concerning the creditworthiness of the Borrower and its Subsidiaries, including without limitation any information contained in any Reports; provided that each Transferee and prospective Transferee agrees to be bound by Section 9.11 of this Agreement.

  • Submission of Grievance Information a) Upon appointment of the arbitrator, the appealing party shall within five days after notice of appointment forward to the arbitrator, with a copy to the School Board, the submission of the grievance which shall include the following:

  • Updated Information Submission by Developer The updated information submission by the Developer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. Developer shall submit a completed copy of the Large Generating Facility data requirements contained in Appendix 1 to the Large Facility Interconnection Procedures. It shall also include any additional information provided to Connecting Transmission Owner for the Interconnection Feasibility Study and Interconnection Facilities Study. Information in this submission shall be the most current Large Generating Facility design or expected performance data. Information submitted for stability models shall be compatible with NYISO standard models. If there is no compatible model, the Developer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information. If the Developer’s data is different from what was originally provided to Connecting Transmission Owner and NYISO pursuant to an Interconnection Study Agreement among Connecting Transmission Owner, NYISO and Developer and this difference may be reasonably expected to affect the other Parties’ facilities or the New York State Transmission System, but does not require the submission of a new Interconnection Request, then NYISO will conduct appropriate studies to determine the impact on the New York State Transmission System based on the actual data submitted pursuant to this Article 24.3. Such studies will provide an estimate of any additional modifications to the New York State Transmission System, Connecting Transmission Owner’s Attachment Facilities, or System Upgrade Facilities or System Deliverability Upgrades based on the actual data and a good faith estimate of the costs thereof. The Developer shall not begin Trial Operation until such studies are completed. The Developer shall be responsible for the cost of any modifications required by the actual data, including the cost of any required studies.

  • Return of material containing or pertaining to the Confidential Information 7.1 The Disclosing Party may, at any time, and in its sole discretion request the Receiving Party to return any material and/or data in whatever form containing, pertaining to or relating to Confidential Information disclosed pursuant to the terms of this Agreement and may, in addition request the Receiving Party to furnish a written statement to the effect that, upon such return, the Receiving Party has not retained in its possession, or under its control, either directly or indirectly, any such material and/or data.

  • Dissemination of own Results 8.3.1.1 During the Project and for a period of 1 year after the end of the Project, the dissemination of own Results by one or several Parties including but not restricted to publications and presentations, shall be governed by the procedure of Article 29.1 of the Grant Agreement subject to the following provisions. Prior notice of any planned publication shall be given to the other Parties at least 45 calendar days before the publication. Any objection to the planned publication shall be made in accordance with the Grant Agreement in writing to the Coordinator and to the Party or Parties proposing the dissemination within 30 calendar days after receipt of the notice. If no objection is made within the time limit stated above, the publication is permitted.

  • Submission of Information 1. The market participant shall submit the following information with its completed and signed Participation Agreement:

  • Project Website The State will develop and maintain a website that will be made available in advance of the first public meeting for this project. The Engineer shall provide project information for the project website to the State including documents related to project background, study area limits, study objectives, project photos, study area maps, material presented at public meetings, and contact information for requesting additional information. The project website will be updated with the documents and other information provided by the Engineer to the State after each set of public meetings and the final report in PDF format provided by the Engineer will be posted by the State to give the general public access to the document.

Time is Money Join Law Insider Premium to draft better contracts faster.