Push-On Joint Pipe Sample Clauses

Push-On Joint Pipe. The joining of Push-On Joint pipe shall be performed in accordance with the AWWA Standard for Installation of Cast Iron Water Mains C600 and in accordance with the manufacturer's instructions and/or recommendations for the particular joint furnished. The inside of the bell and the outside of the spigot end shall be thoroughly cleaned to remove oil, grit, excess coating and other foreign matter. The circular rubber gasket shall be flexed inward and inserted in the gasket recess of the socket. A thin coat of gasket lubricant shall be applied to either the inside surface of the gasket or outside surface of the spigot, or both. Gasket lubricant shall be as supplied by the particular manufacturer and reviewed by the Engineer. The spigot end of the pipe shall be carefully inserted in the socket so that the joining surfaces will not come in contact with the ground, trench bed or trench sides. The joint shall then be completed by forcing the spigot end to the bottom of socket by methods as recommended by the particular manufacturer and concurred with by the Engineer. All pipe shall be furnished with a depth mark to indicate a “full-home” assembly. The Contractor shall provide special transition sleeves or transition pieces of pipe for connecting pipe of different classes; and those special pieces shall be clearly identified with suitable marking. The Contractor will not be permitted to cut nipples from stock classes of pipe in order to make connections or closures. If the Contractor desires to cut lengths in the field to make closures, he shall have on hand an adequate number of lengths of pipe of the various classes having the interior of the barrel gauged to fit the socket of pipe.
AutoNDA by SimpleDocs

Related to Push-On Joint Pipe

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • STRS PICK-UP A. The Board shall pick-up contributions to the State Teachers’ Retirement System paid on behalf of the employees in the bargaining unit utilizing the salary reduction method under the following terms and conditions:

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Unbundled Copper Sub-Loop (UCSL) is a copper facility of any length provided from the cross-box in the field up to and including the End User’s point of demarcation. If available, this facility will not have any intervening equipment such as load coils between the End User and the cross-box.

  • Red Hat Enterprise Linux Server Add-Ons Red Hat Enterprise Linux Server Subscriptions may be purchased with one or more add-on options (“Add-On(s)”). Add-Ons require a separate paid and active Software Subscriptions for each Unit that deploys, installs, uses or executes such Add-On. Each Unit of Add- Ons must match the Support Level (Standard and/or Premium), Unit of Measure and capacity as the underlying Red Hat Enterprise Linux Unit. Add-Ons are not supported on Red Hat Enterprise Linux Subscriptions with a Self-support service level except Smart Management Add-Ons. The Add-Ons include: High Availability, Load Balancer, Resilient Storage, Scalable File System, Smart Management, Extended Update Support, Extended Life Cycle Support and High Performance Network.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!