Quality control system. 12.2.1 The Concessionaire shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”) in accordance with ISO-9001. 12.2.2 The Concessionaire shall, within 30 (thirty) days of the Appointed Date, submit to the Authority‟s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and Documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for Site activities, and proforma for testing and calibration in accordance with the Specifications and Standards and Good Industry Practice; and (c) internal quality audit system. The Authority‟s Engineer shall convey its comments to the Concessionaire within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Concessionaire shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 12.2. 12.2.3 The Concessionaire shall procure all Documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets, Materials and workmanship in accordance with the Quality Assurance Plan. 12.2.4 The cost of testing of Construction, Materials and workmanship under this Article 12 shall be borne by the Concessionaire.
Appears in 1 contract
Samples: Concession Agreement
Quality control system. 12.2.1
11.2.1 The Concessionaire Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”) in accordance with ISO-9001).
12.2.2 11.2.2 The Concessionaire Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority‟s Authority’s Engineer its Quality Assurance Plan which shall include the following:
(a) organisation, duties and responsibilities, procedures, inspections and Documentationdocumentation;
(b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for Site site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Standards Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and
(c) internal quality audit system. The Authority‟s Authority’s Engineer shall convey its comments to the Concessionaire Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Concessionaire Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 12.211.2.
12.2.3 11.2.3 The Concessionaire Contractor shall procure all Documentsdocuments, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets, Materials Assets and workmanship in accordance with the Quality Assurance Plan.
12.2.4 11.2.4 The cost of testing of Construction, Materials and workmanship under this Article 12 11 shall be borne by the ConcessionaireContractor.
Appears in 1 contract
Samples: Construction Contract
Quality control system. 12.2.1 The Concessionaire shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”) in accordance with ISO-9001.
12.2.2 The Concessionaire shall, within 30 (thirty) days of the Appointed Date, submit to the Authority‟s Authority’s Engineer its Quality Assurance Plan which shall include the following:
(a) organisation, duties and responsibilities, procedures, inspections and Documentationdocumentation;
(b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for Site site activities, and proforma for testing and calibration in accordance with the Specifications and Standards and Good Industry Practice; and
(c) internal quality audit system. The Authority‟s Authority’s Engineer shall convey its comments to the Concessionaire within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Concessionaire shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 12.2.
12.2.3 The Concessionaire shall procure all Documentsdocuments, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets, Materials and workmanship in accordance with the Quality Assurance Plan.
12.2.4 The cost of testing of Construction, Materials and workmanship under this Article 12 shall be borne by the Concessionaire.
Appears in 1 contract
Samples: Concession Agreement
Quality control system. 12.2.1 The Concessionaire shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”) in accordance with ISO-9001.
12.2.2 The Concessionaire shall, within 30 (thirty) days of the Appointed Date, submit to the Authority‟s Authority’s Engineer its Quality Assurance Plan which shall include the following:
(a) organisation, duties and responsibilities, procedures, inspections and Documentation;
(b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for Site activities, and proforma for testing and calibration in accordance with the Specifications and Standards and Good Industry Practice; and
(c) internal quality audit system. The Authority‟s Authority’s Engineer shall convey its comments to the Concessionaire within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Concessionaire shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 12.2.
12.2.3 The Concessionaire shall procure all Documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets, Materials and workmanship in accordance with the Quality Assurance Plan.
12.2.4 The cost of testing of Construction, Materials and workmanship under this Article 12 shall be borne by the Concessionaire.
Appears in 1 contract
Samples: Concession Agreement