Common use of Reading and Correction of Meters Clause in Contracts

Reading and Correction of Meters. 6.10.1 The metering point shall be the Delivery Point at 11 kV/22 kV/ 33 kV and EHV voltage level of MSEDCL / STU substations, as the case may be for respective Unit(s) under the SPV. 6.10.2 For the purpose of energy accounting, ABT compliant meters with AMR feature shall be provided and installed by SPV at the Delivery Point. The interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2014 and any amendments thereto and any specifications stipulated by STU/ MSEDCL including those set out in Schedule 6. 6.10.3 The SPV shall bear all costs pertaining to installation, testing, calibration, maintenance, renewal, and repair of meters at Delivery Point. 6.10.4 The ABT metering equipment consisting of Main Meters and check meters with separate ‘Current Transformer’ and ‘Potential Transformer’ shall be identical in make, technical standards and of 0.2s (zero point two seconds) accuracy class and calibration and comply with the requirements of Law. 6.10.5 The meters installed at the Delivery Point shall have 4 (four) quadrants, 3 (three) phase, 4 (four) wires and provision for online/automatic reading and time slots as required by MSEDCL and SLDC. 6.10.6 The SPV shall also establish a backup metering system/check meter which shall be inspected and approved by MSEDCL. 6.10.7 In the event that the main metering system is not in service as a result of maintenance, repairs, or testing, then the backup metering system/check meter shall be used during the period the main metering system is not in service, and the above provisions shall apply to the reading of the backup metering system.

Appears in 16 contracts

Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement

AutoNDA by SimpleDocs

Reading and Correction of Meters. 6.10.1 The metering point shall be the Delivery Point at 11 kV/22 kV/ 33 kV and EHV voltage level of MSEDCL / STU substations, as the case may be for respective Unit(s) under the SPV. 6.10.2 For the purpose of energy accounting, ABT compliant meters with AMR feature shall be provided and installed by SPV at the Delivery Point. The interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2014 and any amendments thereto and any specifications stipulated by STU/ MSEDCL including those set out in Schedule 6. 6.10.3 The SPV shall bear all costs pertaining to installation, testing, calibration, maintenance, renewal, and repair of meters at Delivery Point. 6.10.4 The ABT metering equipment consisting of Main Meters and check meters with separate ‘Current Transformer’ and ‘Potential Transformer’ shall be identical in make, technical standards and of 0.2s (zero point two seconds) accuracy class and calibration and comply with the requirements of Law. 6.10.5 The meters installed at the Delivery Point shall have 4 (four) quadrants, 3 (three) phase, 4 (four) wires and provision for online/automatic reading and time slots as required by MSEDCL and SLDC. 6.10.6 The SPV shall also establish a backup metering system/check meter which shall be inspected and approved by MSEDCL. 6.10.7 In the event that the main metering system is not in service as a result of maintenance, repairs, or testing, then the backup metering system/check meter shall be used during the period the main metering system is not in service, and the above provisions shall apply to the reading of the backup metering system.

Appears in 1 contract

Samples: Power Purchase Agreement

AutoNDA by SimpleDocs