Measurement of Energy. Measurement of electrical energy shall be done at the Interconnection point or points by the metering system.
Measurement of Energy. Measurement of electrical energy shall be done at the Interconnection point or points by the metering system. The metering point will be at the receiving end of STU/DISCOM substation. For the purpose of energy accounting the SPD shall install ABT compliant meter at the metering point.
Measurement of Energy. Measurement of electrical energy shall be done at the Interconnection point or points by the metering system. Metering shall be at 66kV or 33kV side of 220/66kV or 220/33kV substation (as the case may be) where the power from the solar power project is injected and at the 220 kV Side of 400/220kV substation of CTU i.e., POWERGRID. For commercial settlement, inter-connection point or delivery point shall mean the point at 220 kV side of 400/ 220 kV PGCIL Substation of CTU. All costs and losses up to that point will be to the account of the Solar Power Developers. It is pertinent to mention that the metering shall be done as per the provisions mentioned under the Implementation and Support Agreement signed between Karnataka Solar Power Development Corporation Limited and the Solar Power Developer.
Measurement of Energy. Measurement of electrical energy shall be done at the Interconnection point or points by the metering system. Metering shall be at 220 kV side of the 33kV/220kV Solar Park Sub-Station where the power from the solar power project is injected and at the 220 kV side of the 33kV/220kV Solar Park Sub-Station. For commercial settlement, interconnection point or delivery point shall mean the point at 220 kV side of the 33kV/220kV Solar Park Sub-Station. All costs and losses up to that point will be to the account of the Solar Power Developers. It is pertinent to mention that the metering shall be done as per the provisions mentioned under the Implementation and Support Agreement signed between Assam Power Generation Corporation Limited and the Solar Power Developer
Measurement of Energy. 10.2.1 Measurement of electrical energy shall be done at the Interconnection point or points by the metering system. Metering shall be at CTU/STU (ISTS/InSTS) Substation. For commercial settlement, inter-connection point/ delivery point shall mean the point at Substation of CTU/STU.
Measurement of Energy. All electric energy furnished by the Authority hereunder shall be measured at the service location specified in Section 6 of this contract by suitable meter of standard manufacture, to be furnished, installed, maintained, calibrated and read by the Authority at its expense. In the event any meter(s) fails to register, or registers incorrectly the electric energy furnished therethrough during any month, the Authority shall determine the length of the period in such month during which such meter(s) failed to register or registered incorrectly, and the quantity of electric energy delivered during such period utilizing the Company's check metering located at the Company's Stepdown Substation (adjusted for losses), and an appropriate adjustment based thereon shall be made in the Company's bill solely for such month; pxxxxded that in no event shall an adjustment be made for any month unless such meter shall have been tested by the Authority of its own volition or at the written request of the Company within thirty (30) days from and after the date upon which the bill for such month shall havx xxen rendered. Any meter which registers not more than two (2) percent slow or fast shall be deemed correct. No device or connection shall be maintained by the Company at the service location which will prevent any meter from registering correctly the energy used or to be used.
Measurement of Energy. 8.1 The electric energy to be supplied by the Company hereunder will be measured by appropriate meters as the Company may select which together with metering equipment, shall be Installed, owned and maintained by the Company at its expense in a suitable place or building upon the FPUC's premises.
Measurement of Energy. A Customer’s generating facility used for Commercial Generation metering shall be equipped with two meters. One meter will measure all of the kWh’s and demand used by the customer and the other meter will be connected to the line side of the City’s power system and show all kWh’s produced by the customer’s (GF). The City will install both meters at the customer’s expense. The metering equipment shall be used to provide information necessary to accurately xxxx or credit Customer and to collect electrical generating system performance information for research purposes.
Measurement of Energy. Measurement of electrical energy shall be done at the delivery point as approved by the STU / ESCOM.