Reading and Correction of Meters. (i) The metering point will be at the receiving end of GETCO/ CTU substation. For the purpose of energy accounting the Power Producer shall install ABT compliant meter at the metering point. In case of project getting connected to the grid through internal pooling sub-station of an existing wind farm, the Power Producer shall install ABT meters at the Pooling s/s. Further, there shall be separate arrangement for metering of Wind and Solar Project. (ii) Interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations 2014 and amendment thereto. GETCO/ CTU shall stipulate specifications in this regard. (iii) In the event that the Main Metering System is not in service as a result of maintenance, repairs or testing, then the Backup Metering System shall be used during the period the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
Appears in 7 contracts
Samples: Power Purchase Agreement, Power Purchase Agreement (Ppa), Power Purchase Agreement
Reading and Correction of Meters. (i) The metering Metering Point, which is the point will at which energy supplied to the Procurer shall be at measured, shall be the receiving end low voltage bus bar of GETCO/ the STU / CTU substation. All expenses including wheeling charges and losses between the Project and the Delivery Point shall be paid by the Power Producer without any reimbursement by the Procurer.
(ii) For the purpose of energy accounting the Power Producer power producer shall install ABT compliant meter at the metering point. In case of project getting connected to the grid through internal pooling sub-station of an existing wind farm, the Power Producer shall install ABT meters at the Pooling s/s. Further, there shall be separate arrangement for metering of Wind and Solar Project.
(iiiii) Interface metering shall conform confirm to the Central Electricity Authority (Installation and Operation of Meters) Regulations 2014 and amendment thereto. GETCO/ GETCO/CTU shall stipulate specifications in this regard.
(iiiiv) In the event that the Main Metering System is not in service as a result of maintenance, repairs or testing, then the Backup Metering System shall be used during the period the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
Appears in 1 contract
Samples: Power Purchase Agreement (Ppa)
Reading and Correction of Meters. (i) The metering point will be at the receiving end of GETCO/ CTU substation. For the purpose of energy accounting the Power Producer shall install ABT compliant meter at the metering point. In case of project getting connected to the grid through internal pooling sub-station of an existing wind farm, the Power Producer shall install ABT meters at the Pooling s/s. Further, there shall be separate arrangement for metering of Wind and Solar Project.
(ii) Interface metering shall conform to the Central Electricity Authority (Installation and Operation of Meters) Regulations 2014 and amendment thereto. GETCO/ CTU shall may stipulate specifications in this regard.
(iii) In the event that the Main Metering System is not in service as a result of maintenance, repairs or testing, then the Backup Metering System shall be used during the period the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
Appears in 1 contract
Samples: Power Purchase Agreement (Ppa)
Reading and Correction of Meters. (i) The metering Metering Point, which is the point will at which energy supplied to the Procurer shall be at measured, shall be the receiving end low voltage bus bar of GETCO/ the STU / CTU substation. All expenses including wheeling charges and losses between the Project and the Delivery Point shall be paid by the Power Producer without any reimbursement by the Procurer.
(ii) For the purpose of energy accounting the Power Producer power producer shall install ABT compliant meter at the metering point. In case of project getting connected to the grid through internal pooling sub-station of an existing wind farm, the Power Producer shall install ABT meters at the Pooling s/s. Further, there shall be separate arrangement for metering of Wind and Solar Project.
(iiiii) Interface metering shall conform confirm to the Central Electricity Authority (Installation and Operation of Meters) Regulations 2014 2006 and amendment thereto. GETCO/ GETCO/CTU shall stipulate specifications in this regard.
(iiiiv) In the event that the Main Metering System is not in service as a result of maintenance, repairs or testing, then the Backup Metering System shall be used during the period the Main Metering System is not in service and the provisions above shall apply to the reading of the Backup Metering System.
Appears in 1 contract
Samples: Power Purchase Agreement