Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.
STANDARD EQUIPMENT All items of standard equipment which are provided by the OEM shall be furnished unless such items are expressly deleted by the Authorized User or are specified to be other than standard in the Mini-Bid. When Optional equipment is specified, all components listed in the OEM’s data book as being included with the Option shall be furnished.
Equipment Cleaning (a) Areas, known by Forest Service prior to timber sale advertisement, that are infested with invasive species of concern are shown on Sale Area Map. A current list of invasive species of concern and a map showing the extent of known infestations is available at the Forest Supervisor’s Office. For purposes of this provision, “Off-Road Equipment” includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.
Electrical Equipment Residents must use only CSA, UL-approved or Canadian-certified electrical equipment; the rated wattage of light fixtures must never be exceeded; and only replacement bulbs supplied by Waterloo maintenance staff may be used. Do not leave any unattended electrical equipment turned on (i.e. hair straighteners, lights etc.)
Monitoring Equipment 2.2.1 24-hour TSP air quality monitoring was performed using High Volume Sampler (HVS) located at each designated monitoring station. The HVS meets all the requirements of the Project Specific EM&A Manual. Portable direct reading dust meters were used to carry out the 1-hour TSP monitoring. Brand and model of the equipment is given in Table 2.1.
Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.
MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller.
Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.
New Equipment Where new types of equipment and/or operations, for which rates of pay are not established by this Agreement, are put into use after the ratification date of this Agreement within operations covered by this Agreement, rates governing such operations shall be subject to negotiations between the parties. This paragraph shall apply to all new types of equipment including office and clerical equipment. In the event agreement cannot be reached within sixty (60) days after the date such equipment is put into use, the matter may be submit- xxx to the National Grievance Committee for final disposition. Rates agreed upon or awarded shall be effective as of the date equipment is put to use.
Rented Equipment Payment for required equipment rented from an outside company that is neither an affiliate of, nor a subsidiary of, the Design-Builder will be based on receipted invoices which shall not exceed rates given in the current edition of the Rental Rate Blue Book for Construction Equipment published by Data Quest. If actual rental rates exceed manual rates, written justification shall be furnished to the Contracting Officer for consideration. No additional allowance will be made for overhead and profit. The Design-Builder shall submit written certification to the Contracting Officer that any required rented equipment is neither owned by nor rented from the Design- Builder or an affiliate of or subsidiary of the Design-Builder.