Preconstruction Services During the Design & Preconstruction Phase, the Design-Builder shall provide such design and preconstruction services as are necessary to properly advance the Project. Without limiting the generality of the foregoing, during the Preconstruction Phase, the Design-Builder shall: (i) work with its Architect and any design consultants to advance the design for the Project in consultation with Client Agency, the Department and its Program Manager; (ii) obtain bids from trade subcontractors to perform the work described in the Design Development Documents and provide bid tabulations to the Department; (iii) engage in any value engineering and scoping exercises necessary to return the cost of the work to the Project Budget; (iv) engage in preconstruction activities, including identifying any long-lead items; (v) develop a GMP proposal for the Project; and (vi) enter into a GMP for the Project. Throughout the Design & Preconstruction Phase, the Design-Builder shall schedule and attend regular meetings with the Department, the Program Manager and the Architect. A list of preconstruction deliverables is set forth in Exhibit C.
Reconstruction (a) Subject to the provisions of subparagraphs (b) and (c) below, in the event the Premises or any other portion of the Building is damaged by fire or other perils covered by extended coverage insurance, and such damage does not require structural demolition and reconstruction of all or part of the Building, Landlord agrees to forthwith repair such damage utilizing the proceeds of insurance and this Lease shall remain in full force and effect, except that Tenant shall be entitled to an equitable reduction of Minimum Rent from the date of damage until completion of such repairs, based on the extent to which the damage and making of such repairs shall reasonably interfere with the business carried on by Tenant in the Premises. (b) In the event that any casualty requires structural demolition and reconstruction of all or a material part of the Building (whether or not such reconstruction involves any portion of the Premises), Tenant may, at its election, give notice to Landlord at any time within sixty (60) days after such damage, terminating this Lease as of the date of the casualty. In the event of giving such notice, this Lease and all interest of Tenant in the Premises shall terminate on the date of the casualty, the Rent shall be paid up to the date of such casualty, and Landlord shall be entitled to all insurance maintained by Tenant on the Building (except for proceeds attributable to Tenant’s personal property in, on or about the Premises). In the alternative, and so long as at least five (5) years remain in the Term or Tenant then exercises an Option pursuant to Paragraph 3(b), if any Tenant may, by written notice to Landlord within such 60-day period, elect to require Landlord to repair or restore such damage, in which case the Minimum Rent shall be proportionately reduced as provided in subparagraph (a) above and this Lease shall continue in full force and effect; PROVIDED, HOWEVER, that Tenant shall have the right to alter the size and configuration of the Building in the course of such reconstruction, so long as the Building as reconstructed is an integrated architectural unit, the dimensions of the Premises are substantially the same as prior to such casualty and Tenant is able to operate its business as intended at the time of Lease execution, subject to Landlord’s approval which will not be unreasonably conditioned, delayed or denied. If Tenant elects to require Landlord to construct the improvements, Tenant will make available to Landlord all insurance proceeds received by Tenant or due to Tenant, and, prior to any reconstruction, Tenant will deposit with Landlord or its contractor the amount by which the cost of reconstruction exceeds the amount of the insurance proceeds.
Preconstruction Phase The Preconstruction Phase shall mean the period commencing on the date of this CM/GC Contract and ending upon commencement of the Construction Phase; provided that if the Owner and CM/GC agree, the Construction Phase may commence before the Preconstruction Phase is completed, in which case both phases shall proceed concurrently, subject to the terms and conditions of the Contract Documents.
Project Implementation The Borrower shall:
Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.
Project Work Plan The Statement of Work is the formal document incorporated into the Grant. The Project Work Plan documents how the Grantee will achieve the performance measures outlined in the Grant. Changes to the Statement of Work require an amendment. Project Work Plans may be changed with written approval from PEI and the Grantee.
Preconstruction Conference Prior to, or concurrent with, the issuance of the Notice to Proceed with Construction, a conference will be convened for attendance by the Owner, Contractor, A/E and appropriate Subcontractors. The purpose of the conference is to establish a working understanding among the parties as to the Work, the operational conditions at the Project Site, and general administration of the Project. Topics include communications, schedules, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, maintaining required records and all other matters of importance to the administration of the Project and effective communications between the project team members.
Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.
Construction Services 4,500 thousand SDR for Japan Post in Group A 15,000 thousand SDR for all other entities in Group A 4,500 thousand SDR for entities in Group B Architectural, engineering and other technical services covered by this Agreement: 450 thousand SDR
Construction Completion The related Construction shall have been completed substantially in accordance with the related Plans and Specifications, the related Deed and all Applicable Laws, and such Leased Property shall be ready for occupancy and operation. All fixtures, equipment and other property contemplated under the Plans and Specifications to be incorporated into or installed in such Leased Property shall have been substantially incorporated or installed, free and clear of all Liens except for Permitted Liens.