Recording of Connection Points Sample Clauses

Recording of Connection Points. (a) The Water Entity must record on the Water Entitlements Register that a Connection Point is attached to a Water Entitlement if:
AutoNDA by SimpleDocs

Related to Recording of Connection Points

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Interconnection Point The Service Provider is responsible for connecting to the LFC Network at the Interconnection Point. The LFC may only change an Interconnection Point if a change is necessary to protect the security or integrity of that Interconnection Point in order to maintain the continuity of supply of the Wholesale Services. In the event of any such change:

  • Nyiso and Connecting Transmission Owner Authority General.‌‌ NYISO or Connecting Transmission Owner may take whatever actions with regard to the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities it deems necessary during an Emergency State in order to (i) preserve public health and safety, (ii) preserve the reliability of the New York State Transmission System or the Connecting Transmission Owner’s Attachment Facilities, (iii) limit or prevent damage, and (iv) expedite restoration of service. NYISO and Connecting Transmission Owner shall use Reasonable Efforts to minimize the effect of such actions or inactions on the Large Generating Facility or the Developer’s Attachment Facilities. NYISO or Connecting Transmission Owner may, on the basis of technical considerations, require the Large Generating Facility to mitigate an Emergency State by taking actions necessary and limited in scope to remedy the Emergency State, including, but not limited to, directing Developer to shut-down, start-up, increase or decrease the real or reactive power output of the Large Generating Facility; implementing a reduction or disconnection pursuant to Article 13.4.2; directing the Developer to assist with blackstart (if available) or restoration efforts; or altering the outage schedules of the Large Generating Facility and the Developer’s Attachment Facilities. Developer shall comply with all of the NYISO and Connecting Transmission Owner’s operating instructions concerning Large Generating Facility real power and reactive power output within the manufacturer’s design limitations of the Large Generating Facility’s equipment that is in service and physically available for operation at the time, in compliance with Applicable Laws and Regulations.

  • Demarcation Point 98.1 CenturyLink will designate the point of demarcation between CenturyLink’s equipment and CLEC’s collocated equipment, which point of demarcation shall be in or adjacent to its Collocation Space unless otherwise mutually agreed to by the Parties. At CLEC's request, CenturyLink will identify the location(s) of other possible demarcation points available to CLEC, and CLEC will designate from these location(s) the point(s) of demarcation between its collocated equipment and CenturyLink's equipment. CenturyLink will use its best efforts to identify the closest demarcation point to CLEC's equipment that is available.

  • NYISO and Connecting Transmission Owner Obligations Connecting Transmission Owner and NYISO shall cause the New York State Transmission System and the Connecting Transmission Owner’s Attachment Facilities to be operated, maintained and controlled in a safe and reliable manner in accordance with this Agreement and the NYISO Tariffs. Connecting Transmission Owner and NYISO may provide operating instructions to Developer consistent with this Agreement, NYISO procedures and Connecting Transmission Owner’s operating protocols and procedures as they may change from time to time. Connecting Transmission Owner and NYISO will consider changes to their respective operating protocols and procedures proposed by Developer.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Developer and Connecting Transmission Owner Notice Developer and Connecting Transmission Owner shall each notify the other Party, first orally and then in writing, of the release of any Hazardous Substances, any asbestos or lead abatement activities, or any type of remediation activities related to the Large Generating Facility or the Attachment Facilities, each of which may reasonably be expected to affect the other Party. The notifying Party shall: (i) provide the notice as soon as practicable, provided such Party makes a good faith effort to provide the notice no later than twenty-four hours after such Party becomes aware of the occurrence; and (ii) promptly furnish to the other Party copies of any publicly available reports filed with any Governmental Authorities addressing such events.

  • Metering Requirements Seller shall comply with all applicable rules in installing a meter appropriate for deliveries pursuant to the Full Buy/Sell or Excess Sale arrangement selected in paragraph 2.2, above, which can be electronically read daily by:

  • Indirect Network Connection 64.8.1 For purposes of this Agreement, Indirect Traffic means traffic which is originated by one Party and terminated to the other Party in which a third party ILEC’s Tandem switch both provides the intermediary Transit Service and serves CenturyLink’s NXXs. Indirect Network Connection for Indirect Traffic is intended only for de minimis traffic associated with CLEC “start- up” market entry into a CenturyLink local exchange. Therefore Indirect Network Connection will be allowed only on routes between CenturyLink End Offices and a CLEC switch in instances where, and only so long as, none of the POI thresholds set forth in Section 64.4.2 have been reached.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.