REINFORCED CONCRETE Sample Clauses

REINFORCED CONCRETE. For all works in super structure/ foundation 1:1.5:3 nominal mix by volume shall be used for achieving strength of M20 concrete. Only crushed coarse aggregates shall be used for concreting. Steel shall be high yield strength deformed bars conforming to IS – 1786 or TMT steel.
AutoNDA by SimpleDocs
REINFORCED CONCRETE. 25MPa/19mm concrete CONCRETE SUNDRIES FORMWORK Smooth formwork to sides Smooth formwork to soffits
REINFORCED CONCRETE. 20MPa/19mm concrete 25MPa/19mm concrete 30MPa/19mm concrete
REINFORCED CONCRETE. Reinforced concrete with a coarse aggregate of 19mm and a minimum compressive strength of 25MPa at 28 days 18 In ramps m3 4.00
REINFORCED CONCRETE. No reinforcing steel shall be displaced to accommodate the installation of raceways and outlet boxes. In general, all embedded conduits shall be located in the physical center of the particular section of concrete. Raceways embedded in reinforced concrete shall require special clarification. Particular attention is called to the fact that there are many extenuating conditions where the Contractor may be instructed in writing during the course of the project not to place embedded conduits in certain areas, generally due to the possibility of unsightly cracking or for structural reasons. This instruction shall not entitle the Contractor to extra compensation.
REINFORCED CONCRETE. 25MPa/19mm concrete Smooth formwork to soffits Smooth formwork to circular columns
REINFORCED CONCRETE. 25MPa/19mm concrete TEST BLOCKS SECTION NUMBER 2 BILL NUMBER 4 FORMWORK WORK GROUP NUMBER 111 E.P.W.P. PROGRAM
AutoNDA by SimpleDocs
REINFORCED CONCRETE. Mix Review
REINFORCED CONCRETE. Floors shall be constructed to a 125 mm thick with 30 MPA concrete in general unless the tenant specifically required a higher loading requirement. Point floor loading and special toppings are not allowed for in the slabs. All floors will be fully reinforced as required and inspected by the engineer prior to all pours.

Related to REINFORCED CONCRETE

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • COVID-19 Vaccine Passports Pursuant to Texas Health and Safety Code, Section 161.0085(c), Contractor certifies that it does not require its customers to provide any documentation certifying the customer’s COVID-19 vaccination or post-transmission recovery on entry to, to gain access to, or to receive service from the Contractor’s business. Contractor acknowledges that such a vaccine or recovery requirement would make Contractor ineligible for a state-funded contract.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Grades At the end of each semester, students shall receive a final grade report that shall become a part of their permanent record. The College District’s grading system shall apply to all courses: A (90-100) - Excellent B (80-89) - Good C (70-79) - Average D (60-69) - Poor F (Below 60) - Failure I Incomplete Q Dropped W Dropped Due to Good Cause or Withdrawal from College CR Credit P Pass NP Not Passing FS Academic Fresh Start I - Incomplete: indicates that the coursework was incomplete because of serious illness or other justified emergency. The instructor shall change the grade of “I” to a grade based on the work completed for the course in addition to the work specified in the course completion contract. All incomplete work shall be completed within 90 days of the start of the next long semester. Failure to complete the work specified in the course completion contract shall result in a grade of zero, which shall be factored into the final grade calculation with appropriate weighting relative to other course grades.

  • Number Resources, Rate Center Areas and Routing Points 8.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes. 8.2 It shall be the responsibility of each Party to program and update its own switches and network systems pursuant to information provided in the LERG in order to recognize and route traffic to the other Party’s assigned NXX codes. Except as expressly set forth in this Agreement, neither Party shall impose any fees or charges whatsoever on the other Party for such activities. 8.3 Unless otherwise required by Commission order, the Rate Center Areas will be the same for each Party. During the term of this Agreement, Onvoy shall adopt the Rate Center Area and Rate Center Points that the Commission has approved for Frontier within the LATA and Tandem serving area. Onvoy shall assign whole NPA-NXX codes to each Rate Center Area unless otherwise ordered by the FCC, the Commission or another governmental entity of appropriate jurisdiction, or the LEC industry adopts alternative methods of utilizing NXXs. 8.4 Onvoy will also designate a Routing Point for each assigned NXX code. Onvoy shall designate one location for each Rate Center Area in which the Onvoy has established NXX code(s) as the Routing Point for the NPA-NXXs associated with that Rate Center Area, and such Routing Point shall be within the same LATA as the Rate Center Area but not necessarily within the Rate Center Area itself. Unless specified otherwise, calls to subsequent NXXs of Onvoy will be routed in the same manner as calls to Xxxxx’s initial NXXs. 8.5 Notwithstanding anything to the contrary contained herein, nothing in this Agreement is intended, and nothing in this Agreement shall be construed, to in any way constrain Onvoy’s choices regarding the size of the local calling area(s) that Onvoy may establish for its Customers, which local calling areas may be larger than, smaller than, or identical to Frontier’s local calling areas.

  • Components Patheon will purchase and test all Components (with the exception of Client-Supplied Components) at Patheon’s expense and as required by the Specifications.

  • Loop Makeup Response Time - Electronic Exclusions Business Rules

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!