Release Facility and Primary Storage Lot Sample Clauses

Release Facility and Primary Storage Lot. The Contractor shall have a release facility and a primary storage lot for storing impounded vehicles. The Contractor’s release facility shall be located at its primary storage lot. The release facility and primary storage lot shall be within the Contracted Zone, in a Zone adjacent to the Contracted Zone, or for Zones 1 and 2 within five miles of the City limits to the north, or for Zones 5 and 6 within five miles of the City limits to the south. The Release Facility shall be reasonably accessible to one or more public transit routes.
AutoNDA by SimpleDocs

Related to Release Facility and Primary Storage Lot

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Additional Requirements from Authorized Users An Authorized User may have distinct requirements that must be met by all individuals employed by or working for the Authorized User. The Contractor’s Staff Members will be expected to comply with these requirements as a condition of the placement.

  • Substance Use Disorder counseling shall be provided by a QCC, or Chemical Dependency Counselor Intern. Substance use disorder education and life skills training shall be provided by counselors or individuals who have been trained in the education. All counselor interns shall work under the direct supervision of a QCC.

  • Zone File Access Agreement Registry Operator will enter into an agreement with any Internet user, which will allow such user to access an Internet host server or servers designated by Registry Operator and download zone file data. The agreement will be standardized, facilitated and administered by a Centralized Zone Data Access Provider, which may be ICANN or an ICANN designee (the “CZDA Provider”). Registry Operator (optionally through the CZDA Provider) will provide access to zone file data per Section 2.1.3 of this Specification and do so using the file format described in Section 2.1.4 of this Specification. Notwithstanding the foregoing, (a) the CZDA Provider may reject the request for access of any user that does not satisfy the credentialing requirements in Section 2.1.2 below; (b) Registry Operator may reject the request for access of any user that does not provide correct or legitimate credentials under Section 2.1.2 below or where Registry Operator reasonably believes will violate the terms of Section 2.1.5. below; and, (c) Registry Operator may revoke access of any user if Registry Operator has evidence to support that the user has violated the terms of Section 2.1.5 below.

  • Agreement with Respect to Leased Data Processing Equipment (a) The Receiver hereby grants to the Assuming Bank an exclusive option for the period of ninety (90) days commencing the day after Bank Closing to accept an assignment from the Receiver of any or all Data Processing Leases to the extent that such Data Processing Leases can be assigned.

  • REMOVAL OF RECORDS FROM PREMISES Where performance of the Contract involves use by the Contractor (or the Contractor’s subsidiaries, affiliates, partners, agents or subcontractors) of Authorized User owned or licensed papers, files, computer disks or other electronic storage devices, data or records at Authorized User facilities or offices, or via remote access, the Contractor (or the Contractor’s subsidiaries, affiliates, partners, agents or subcontractors) shall not remotely access, modify, delete, copy or remove such Records without the prior written approval of the Authorized User. In no case, with or without the written approval of the Authorized User, can the Authorized User data be accessed, moved or sent outside the continental United States.

  • Unbundled Voice Loops (UVLs) 2.2.1 BellSouth shall make available the following UVLs:

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

Time is Money Join Law Insider Premium to draft better contracts faster.