Released Material. In case of planned dismantling of any existing asset on Site as a part of the Project, the detailed plan and procedure for the dismantling activity with possible repercussions and disposal of released material and other relevant details, shall be submitted by the Contractor. Such work shall be taken up only after the approval of Authority. [The joint inventory of the existing material in the Site to be dismantled shall be listed prior to commencement of the dismantling/undertaking Works at such portions of the Site by the Authority Engineer, Contractor and AuthorityRepresentative. The structure, buildings and other properties/material which are disturbed or dismantled, shall be the property of the Authority, unless any materials (such as debris etc.) are specifically instructed by the Authority to be disposed off by the Contractor. Such materials of all kind and sort shall be transported and handed over in depot /placeswithin [5 km] of location of the Project,by the Contractor at its own cost, as per the direction of the Authority. The Contractor shall be fully responsible for safe guarding of such material while it is in its custody, till the time it is handed over to the Authority Representative.]