Relevance of Design and Formulation Sample Clauses

Relevance of Design and Formulation. 7. The project was highly relevant to government and ADB sector strategies when it was appraised and remained so at completion. It continues to be highly relevant to ADB’s Strategy 3 The RRP for the project reported a higher prevalence of such vector-borne diseases as malaria in Rajasthan, where 5,103 cases per 100,000 were reported in 1992-1993, compared with an average of 3,324 cases per 100,000 in the country as a whole in the same period.
AutoNDA by SimpleDocs

Related to Relevance of Design and Formulation

  • Coordination of Design and Construction Contract Documents 5.5.1 Review model(s), Drawings, Specifications and other Construction Documents as they are developed by A/E during the Schematic Design, Design Development, and Construction Documents design phases of the Project.

  • APPLICATION AND SCOPE 4.1. All employers and employees within the clothing manufacturing industry, and their respective organisations are encouraged to use this Code to develop, implement and refine their HIV/AIDS policies and programmes to suit the needs of their workplaces.

  • Release of Design Plan The Engineer (1) will not release any roadway design plan created or collected under this contract except to its subproviders as necessary to complete the contract; (2) shall include a provision in all subcontracts which acknowledges the State’s ownership of the design plan and prohibits its use for any use other than the project identified in this contract; and (3) is responsible for any improper use of the design plan by its employees, officers, or subproviders, including costs, damages, or other liability resulting from improper use. Neither the Engineer nor any subprovider may charge a fee for the portion of the design plan created by the State.

  • Design and Construction In complying with the requirements of the specification both with respect to arrangement and detail, design is to conform to the best current engineering practice. Each of the several parts of the material is to be of the maker’s standard design provided that this design is in general accordance with the specification. The essence of design should be simplicity and reliability in order to give long continuous service with high economy and low maintenance cost. Particular attention should be paid to internal and external access in order to facilitate inspection, cleaning and maintenance. The design dimensions and materials of all parts are to be such that they will not suffer damage as a result of stresses under the most severe conditions. Fully detailed specifications of the several parts of the material are to be submitted describing particularly the materials to be used. The materials used in the construction of the material are to be of the highest quality and selected particularly to meet the duties required of them. Mechanisms are to be constructed to avoid sticking due to rust or corrosion. Workmanship and general finish are to be of the highest class throughout. All similar parts of the material are to be interchangeable. All equipment is to operate without undue vibration and with the least possible amount of noise and is not to cause a nuisance. All equipment is to be designed to minimize the risk of fire and any damage, which may be caused in the event of fire. The equipment is also to be designed to prevent ingress of all vermin, accidental contact with live parts and to minimize the ingress of dust and dirt. The use of materials, which may be liable to attack by termites or other insects, is to be avoided.

  • Construction and Scope of Agreement The language of all parts of this Agreement shall in all cases be construed as a whole, according to its fair meaning, and not strictly for or against any party. This Agreement is the only, sole, entire, and complete agreement of the parties relating in any way to the subject matter hereof. No statements, promises, or representations have been made by any party to any other, or relied upon, and no consideration has been offered or promised, other than as may be expressly provided herein. This Assumption of Risk, Release of Claims, Indemnification, and Hold Harmless and Agreement supersedes any earlier written or oral understandings or agreements between the parties. Participant acknowledges that he/she has read this Assumption of Risk, Release of Claims, Indemnification and Hold Harmless Agreement, understands its meaning and effect, and agrees to be bound by it. Date:

  • Introduction and Purpose The Kentucky Community and Technical College System (KCTCS) and the Kentucky Department of Education (KDE) mutually support the attainment of dual credit coursework for high school students. This Memorandum of Understanding (MOU) underscores the dedication of both agencies to improving the educational attainment of Kentucky citizens and reinforces the collaboration necessary to achieve this level of success. Improving the educational attainment of Kentucky citizens is key to ensuring the State’s long-term success. The State commits significant resources across the educational spectrum to develop and implement strategies to address this critical issue. Providing secondary students dual credit opportunities is a proven educational strategy with the capacity to complement and maximize the chances of success of our educational initiatives. Effective dual credit systems have impacts both at the secondary and postsecondary levels and provide the opportunity for collaboration. Participants are expected to know and follow current and future versions of Dual Credit Policies established by the Kentucky Council on Postsecondary Education found at: xxxx://xxx.xx.xxx/policies/dualcredit.html. Should policies change during the academic year, KCTCS may request support in meeting those changes outside the scope of this document.

  • Identification of Construction Documents The Design Professional shall identify the Construction Documents, which shall include, but are not limited to, the Specifications, the Drawings, and all Addenda. The Construction Documents are included within the Contract Documents.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Scope of Work and Deliverables 9.1 Background and Scope

  • Hours of Work and Scheduling Provisions (b) In the event an Employee is scheduled to work on the evening or night Shift(s) on the day(s) or the night Shift commencing on the day(s) on which the Employee is called as a juror or witness in matters arising out of the Employee’s employment with the Employer, the Employee shall be granted a leave of absence for those scheduled Shift(s).

Time is Money Join Law Insider Premium to draft better contracts faster.