Renewable Energy and Renewable Energy Credits Sample Clauses

Renewable Energy and Renewable Energy Credits. If you have selected a renewable energy product from SmartEnergy, your rate includes an additional charge for the purchasing of Renewable Energy Certificates and the following provision applies: SmartEnergy will, either directly and/or through its affiliate(s), retire, on your behalf, non-certified Renewable Energy Credits (“RECs”) resulting from electricity generated from renewable energy sources, which may include solar, wind, geothermal, biomass, biogas, or low-impact hydro, in an amount matching either all of your usage for a calendar year or the renewable content amount specified in your plan description. Each REC represents 1,000 kilowatt hours. You will not have electricity from a specific generation facility delivered directly to your meters; but, through this product, you can support generators of renewable energy that provide electricity to the electricity grid. Renewable energy source availability and generation varies hour-to-hour and from season-to-season, as does all customer electricity usage. SmartEnergy relies on regional system power from the grid to serve its customers' minute-by-minute consumption. But, through retirement of RECs by SmartEnergy, on behalf of customers, SmartEnergy will acquire enough RECs to match either all of your usage or the renewable content amount specified in your plan description. SmartEnergy may take up to six (6) months after the end of a calendar year to retire RECs needed to fulfill this product. SmartEnergy will not be liable to you or any other party for any advertising assertions related to this product including, without limitation, any claim or liability arising from a representation made as to the “green” or “carbon free” nature of the electricity or this product.
AutoNDA by SimpleDocs

Related to Renewable Energy and Renewable Energy Credits

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Pacific Gas and Electric Company “PG&E”), San Diego Gas & Electric Company (“SDG&E”), and Southern California Edison Company (“Edison”) (each a Participating TO) are entering into this agreement transferring Operational Control of their transmission facilities in reliance upon California Public Utilities Code Sections 367, 368, 375, 376, and 379 enacted as part of AB 1890 which contain assurances and schedules with respect to recovery of transition costs.

Time is Money Join Law Insider Premium to draft better contracts faster.