Repair/rectification of Defects and deficiencies Sample Clauses

Repair/rectification of Defects and deficiencies. The Contractor shall repair and rectify the Defects and deficiencies specified in this Annex-I of Schedule-E within the time limit set forth in the table below. Table -1: Maintenance Criteria for Pavements: Asset Type Perform ancePar amet er Level of Service (LOS) Freque ncy of Inspect ion Tools/Equip ment Standards and References for Inspection and Data Analysis Time limit for Rectification/ Repair Maintena nceSpecifi cations Desirable Accepta ble Flexible Pavement (Pavement of MCW, Service Road,approache Potholes Nil < 0.1 %of area and subject to limit of 10 mm in depth Daily Length Measuremen t Unit like Scale, Tape, odometer etc. IRC 82: 2015 and Distress Identification Manual for Long Term Pavement Performance Program, FHWA 2003 (xxxx://xxx.xxxxx.xxx/pavement/lttp/ reports/03031/) 24-48 hours MORT&H Specificatio n 3004.2 Asset Type s of Grade structure, approache s of connecting roads, slip roads, lay byes etc. as applicable) Perform ancePar amet er Level of Service (LOS) Freque ncy of Inspect ion Tools/Equip ment Standards and References for Inspection and Data Analysis Time limit for Rectification/ Repair Maintena nceSpecifi cations Desirable Accepta ble Cracking Nil < 5 %subject to limitof 0.5 sqm for any 50 m length Daily 7-15 days MORT&H Specificatio n 3004.3 Rutting Nil < 5 mm Daily Straight Edge 15 -30 days MORT&H Specificatio n 3004.2 Corrugatio ns and Shoving Nil < 0.1% ofarea Daily Length Measuremen t Unit like 2-7 days IRC:82- 2015 Asset Type Perform ancePar amet er Level of Service (LOS) Freque ncy of Inspect ion Tools/Equip ment Standards and References for Inspection and Data Analysis Time limit for Rectification/ Repair Maintena nceSpecifi cations Desirable Accepta ble Bleeding Nil < 1 % of area Daily Scale, Tape, odometer etc. 3-7 days MORT&H Specificatio n 3004.4 Ravelling / Stripping Nil < 1 % of area Daily 7-15 days IRC:82- 2015 read with IRC SP 81 Edge Deformati on/ Breaking Nil < 1 m for any 100 m section and width <0.1 m at any location, restricte Daily 7- 15 days IRC:82- 2015 Asset Type Perform ancePar amet er Level of Service (LOS) Freque ncy of Inspect ion Tools/Equip ment Standards and References for Inspection and Data Analysis Time limit for Rectification/ Repair Maintena nceSpecifi cations Desirable Accepta ble d to 30 cm from the edge Roughness BI 2000 mm/km 2400 mm/km Bi- Annuall y Class I Profilometer SCRIM (Sideway- force Coefficient Routine Investigation Machine or equivalent) Class I Profilometer : ASTM E950 (98) :20...
AutoNDA by SimpleDocs
Repair/rectification of Defects and deficiencies. The Contractor shall repair and rectify the Defects and deficiencies specified in this Annex-I of Schedule-E within the time limit set forth in the table below.
Repair/rectification of Defects and deficiencies a. The obligations of the Concessionaire in respect of Maintenance Requirements shall include repair and rectification of the defects and deficiencies specified in Annex - I of this Schedule H within the time limit set forth therein.

Related to Repair/rectification of Defects and deficiencies

  • Correction of Deficiencies The contractor must correct promptly any work of his/her own or his/her subcontractors found to be defective or not complying with the terms of the contract.

  • Correction of Defects 35.1 The Engineer shall give notice to the Contractor of any Defects before the end of the Defects Liability Period, which begins at Completion and is defined in the Contract Data. The Defects Liability Period shall be extended for as long as Defects remain to be corrected.

  • Defects a. The Customer shall inspect the Goods upon delivery and will, within 48 hours, notify the Company of any defects, short deliveries or any failure to fulfill any quotation or order.

  • Correction of Errors Contractor shall perform, at its own cost and expense and without reimbursement from the District, any work necessary to correct errors or omissions which are caused by the Contractor’s failure to comply with the standard of care required herein.

  • Cost of remedying Defects Any repair or rectification undertaken in accordance with the provisions of Clause 17.2, including any additional testing, shall be carried out by the Contractor at its own risk and cost, to the extent that such rectification or repair is attributable to:

Time is Money Join Law Insider Premium to draft better contracts faster.