System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.
Problem Solving Employees and supervisors are encouraged to attempt to resolve on an informal basis, at the earliest opportunity, a problem that could lead to a grievance. If the matter is not resolved by informal discussion, or a problem-solving meeting does not occur, it may be settled in accordance with the grievance procedure. Unless mutually agreed between the Employer and the Union problem-solving discussions shall not extend the deadlines for filing a grievance. The Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, either with the employee or alone, shall present to the appropriate supervisor a written request for a meeting. If the supervisor agrees to a problem- solving meeting, this meeting shall be held within fourteen (14) calendar days of receipt of the request. The supervisor, employee, Union Xxxxxxx, and up to one (1) other management person shall attempt to resolve the problem through direct and forthright communication. If another member of management is present that person will not be hearing the grievance at Step Two, should it progress to that Step. The employee, the Union Xxxxxxx or in their absence, the Local Union President, or Area Xxxxxxx, or Chief Xxxxxxx, may participate in problem-solving activities on paid time, in accordance with Article 31, Union Rights, Section 1H.
NONPAYMENT AND PROCEDURES FOR DISCONNECTION 12.1 If a Party is furnished Interconnection Services under the terms of this Agreement in more than one (1) state, Section 12.2 below through Section 12.19 below, inclusive, shall be applied separately for each such state. 12.2 Failure to pay charges shall be grounds for disconnection of Interconnection Services furnished under this Agreement. If a Party fails to pay any charges billed to it under this Agreement, including but not limited to any Late Payment Charges or Unpaid Charges, and any portion of such Unpaid Charges remain unpaid after the Bill Due Date, the Billing Party will send a Discontinuance Notice to such Non-Paying Party. The Non-Paying Party must remit all Unpaid Charges to the Billing Party within fifteen (15) calendar days of the Discontinuance Notice. 12.3 AT&T-21STATE will also provide any written notification to any Commission as required by any State Order or Rule. 12.4 If the Non-Paying Party desires to dispute any portion of the Unpaid Charges, the Non-Paying Party must complete all of the following actions not later than fifteen (15) calendar days following receipt of the Billing Party’s notice of Unpaid Charges: 12.4.1 notify the Billing Party in writing which portion(s) of the Unpaid Charges it disputes, including the total Disputed Amounts and the specific details listed in Section 13.4 below of this Agreement, together with the reasons for its dispute; and 12.4.2 pay all undisputed Unpaid Charges to the Billing Party; and 12.4.3 pay all Disputed Amounts (other than Disputed Amounts arising from Intercarrier Compensation) into an interest bearing escrow account that complies with the requirements set forth in Section 11.10 above; and 12.4.4 furnish written evidence to the Billing Party that the Non-Paying Party has established an interest bearing escrow account that complies with all of the terms set forth in Section 11.10 above and deposited a sum equal to the Disputed Amounts into that account (other than Disputed Amounts arising from Intercarrier Compensation). Until evidence that the full amount of the Disputed Charges (other than Disputed Amounts arising from Intercarrier Compensation) has been deposited into an escrow account that complies with Section
System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.
System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2
Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.
Failure to Meet Timelines Failure by the Union to comply with the timelines will result in the automatic withdrawal of the grievance. Failure by the Employer to comply with the timelines will entitle the Union to move the grievance to the next step of the procedure.
Updated Information Submission by Interconnection Customer The updated information submission by the Interconnection Customer, including manufacturer information, shall occur no later than one hundred eighty (180) Calendar Days prior to the Trial Operation. The Interconnection Customer shall submit a completed copy of the Electric Generating Unit data requirements contained in Appendix 1 to the LGIP. It shall also include any additional information provided to the Participating TO and the CAISO for the Interconnection Studies. Information in this submission shall be the most current Electric Generating Unit design or expected performance data. Information submitted for stability models shall be compatible with the Participating TO and CAISO standard models. If there is no compatible model, the Interconnection Customer will work with a consultant mutually agreed to by the Parties to develop and supply a standard model and associated information.
Problems To endeavour to resolve in a fair and just manner any problems, grievances or difficulties which may be encountered while you volunteer with us;