Restoration Testing Sample Clauses

Restoration Testing. Advanced will simulate a system data recovery from backup to cloud infrastructure. Advanced will be responsible for a smoke test of the site during restoration. To ensure proper testing, the following steps will be executed: 1. Advanced to simulate a data restore using the point in time restore backup 2. City of Fort Xxxxx to ensure system is functional after restoration Restoration testing will happen after Functional Testing and requires 6 hours of effort. Additional effort will be subject to a change order.
AutoNDA by SimpleDocs

Related to Restoration Testing

  • Restoration The following provisions shall apply in connection with the Restoration of any Property or Properties affected by a Casualty: (a) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is less than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) if Net Proceeds are paid by the insurance company directly to Borrower subsequent to delivering such undertaking, such Net Proceeds may be retained by Borrower (for the avoidance of doubt, Net Proceeds received by Borrower prior to delivering such undertaking shall be immediately paid to Lender as required by Section 5.2), (B) if Net Proceeds are paid by the insurance company to Lender, such Net Proceeds will be disbursed by Lender to Borrower and (C) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of Section 5.4(c) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (b) If the Net Proceeds reasonably expected to be received in connection with any single Casualty event is greater than the Casualty Threshold Amount, then, (i) if no Event of Default shall have occurred and be continuing and, within sixty (60) days of the date of the occurrence of such Casualty, Borrower delivers to Lender a written undertaking to expeditiously commence and to satisfactorily complete with due diligence the Restoration of the affected Properties in accordance with the terms of this Agreement, then (A) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2 and (B) Borrower shall conduct the Restoration of the affected Properties in accordance with the terms of and subject to the conditions of Section 5.4(d) and (ii) if an Event of Default shall have occurred and be continuing or Borrower fails to deliver such an undertaking to Lender, then (A) Lender may retain any Net Proceeds received by it, (B) Borrower shall immediately deliver to Lender any Net Proceeds paid to Borrower as required by Section 5.2, (C) such Net Proceeds shall be applied to the prepayment of the Debt in accordance with Section 2.4.3(c), (D) Borrower shall prepay the Loan in an amount equal to the positive difference between such Net Proceeds and the Allocated Loan Amount for the affected Properties, together with all interest and other amounts required to be paid in connection therewith under Section 2.4.5, and (E) following Borrower’s written request and receipt by Lender of the Net Proceeds and payment by Borrower of the amounts set forth in clause (D) above, Lender shall release the affected Properties from the applicable Mortgage Documents and related Liens, provided, that (x) Borrower has delivered to Lender draft releases (and, in the event any of the Mortgages and the Assignments of Leases and Rents applicable to any of the affected Properties encumber other Property(ies) in addition to the affected Properties, such release shall be a partial release that relates only to the affected Property(ies) and does not affect the Liens and security interests encumbering or on the other Property(ies)) in form and substance appropriate for the jurisdiction in which such affected Properties are located and shall contain standard provisions protecting the rights of Lender and (y) Borrower shall pay all costs, taxes and expenses associated with such release (including, without limitation, cost to file and record the release and Lender’s reasonable attorneys’ fees). (c) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(a), (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (iii) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards and (iv) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender. (d) If Borrower elects to undertake the Restoration of a Property or Properties pursuant to Section 5.4(b), the following provisions shall apply: (i) the Net Proceeds shall be made available to Borrower for Restoration upon the determination of Lender that the following conditions are met: (i) Borrower shall commence the Restoration as soon as reasonably practicable (but in no event later than ninety (90) days after such Casualty occurs) and shall diligently pursue the same to satisfactory completion; (ii) Lender shall be satisfied that any operating deficits, including all scheduled payments of principal and interest under the Note, which will be incurred with respect to the Properties as a result of the occurrence of the Casualty, whichever the case may be, will be covered out of (1) the Net Proceeds, (2) the insurance coverage referred to in Section 5.1.1 (a) (ii), if applicable, or (3) by other funds of Borrower; (iii) Lender shall be satisfied that the Restoration will be completed on or before the earliest to occur of (1) the date six (6) months prior to the Stated Maturity Date, as extended pursuant to Section 2.7, (2) the earliest date required for such completion under the terms of any Lease, (3) such time as may be required under applicable Legal Requirements or (4) six (6) months prior to the expiration of the insurance coverage referred to in Section 5.1.1 (a) (ii); (iv) Borrower shall cause the affected Property and the use thereof after the Restoration to be in compliance with and permitted under all applicable Legal Requirements and such Property, after Restoration, shall be of the same character as prior to such damage or destruction; (v) the Restoration shall be done and completed by Borrower in an expeditious and diligent fashion and in compliance with all applicable Legal Requirements and the Renovation Standards; (vi) Borrower shall deliver, or cause to be delivered, to Lender a signed detailed budget approved in writing by Borrower’s architect or engineer stating the entire cost of completing the Restoration, which budget shall be reasonably acceptable to Lender and (vii) the Net Proceeds together with any cash or cash equivalent deposited by Borrower with Lender are sufficient in Lender’s discretion to cover the cost of the Restoration. (ii) The Net Proceeds shall be held by Lender in the Casualty and Condemnation Account and, until disbursed in accordance with the provisions of this Section 5.4(d), shall constitute additional security for the Debt and other obligations under the Loan Documents. The Net Proceeds shall be disbursed by Lender to, or as directed by, Borrower from time to time during the course of the Restoration, upon receipt of evidence satisfactory to Lender that (A) all materials installed and work and labor performed (except to the extent that they are to be paid for out of the requested disbursement) in connection with the Restoration have been paid for in full, and (B) there exist no notices of pendency, stop orders, mechanic’s or materialman’s liens or notices of intention to file same, or any other liens or encumbrances of any nature whatsoever on the Properties which have been fully bonded to the satisfaction of Lender and discharged of record or in the alternative fully insured to the satisfaction of Lender by the title company issuing the Title Insurance Policy. (iii) All plans and specifications required in connection with the Restoration shall be subject to the prior approval of Lender and an independent consulting engineer selected by Lender (the “Casualty Consultant”). Lender shall have the use of the plans and specifications and all permits, licenses and approvals required or obtained in connection with the Restoration. The identity of the contractors, subcontractors and materialmen engaged in the Restoration, as well as the contracts under which they have been engaged, shall be subject to the approval of Lender and the Casualty Consultant. All costs and expenses incurred by Lender in connection with recovering, holding and advancing the Net Proceeds for the Restoration including, without limitation, reasonable attorneys’ fees and disbursements and the Casualty Consultant’s fees and disbursements, shall be paid by Borrower. (iv) In no event shall Lender be obligated to make disbursements of the Net Proceeds in excess of an amount equal to the costs actually incurred from time to time for work in place as part of the Restoration, as certified by the Casualty Consultant, less the Casualty Retainage. The term “Casualty Retainage” shall mean, as to each contractor, subcontractor or materialman engaged in the Restoration, an amount equal to ten percent (10%) of the costs actually incurred for work in place as part of the Restoration, as certified by the Casualty Consultant, until the Restoration has been completed. The Casualty Retainage shall in no event, and notwithstanding anything to the contrary set forth above in this Section 5.4(d), be less than the amount actually held back by Borrower from contractors, subcontractors and materialmen engaged in the Restoration. The Casualty Retainage shall not be released until the Casualty Consultant certifies to Lender that the Restoration has been completed in accordance with the provisions of this Section 5.4(b) and that all approvals necessary for the re-occupancy and use of the Property have been obtained from all appropriate Governmental Authorities, and Lender receives evidence satisfactory to Lender that the costs of the Restoration have been paid in full or will be paid in full out of the Casualty Retainage; provided, however, that Lender will release the portion of the Casualty Retainage being held with respect to any contractor, subcontractor or materialman engaged in the Restoration as of the date upon which (x) the Casualty Consultant certifies to Lender that such contractor, subcontractor or materialman has satisfactorily completed all work and has supplied all materials in accordance with the provisions of such contractor’s, subcontractor’s or materialman’s contract, (y) the contractor, subcontractor or materialman delivers the lien waivers and evidence of payment in full of all sums due to the contractor, subcontractor or materialman as may be reasonably requested by Lender or by the title company issuing the Title Insurance Policy, and (z) Lender receives an endorsement to the Title Insurance Policy insuring the continued priority of the Lien of the Mortgage and evidence of payment of any premium payable for such endorsement. If required by Lender, the release of any such portion of the Casualty Retainage shall be approved by the surety company, if any, which has issued a payment or performance bond with respect to the contractor, subcontractor or materialman.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Inspection/Testing In order to assess Supplier’s work quality and/or compliance with this Order, upon reasonable notice by Buyer: (a) all goods, materials and services related to the items purchased hereunder, including, raw materials, components, assemblies, work in process, tools and end products shall be subject to inspection and testing by Buyer, its customer, representative or regulatory authorities at all places, including sites where the goods are made or located or the services are performed, whether at Supplier’s premises or elsewhere; and (b) all of Supplier’s facilities, books and records relating to this Order shall be subject to inspection by Buyer or its designee. If specific Buyer and/or Buyer’s customer tests, inspection and/or witness points are included in this Order, the goods shall not be shipped without an inspector’s release or a written waiver of test/inspection/witness with respect to each such point; however, Buyer shall not be permitted to unreasonably delay shipment; and Supplier shall notify Buyer in writing at least twenty (20) days prior to each of Supplier’s scheduled final and, if applicable, intermediate test/inspection/witness points. Supplier agrees to cooperate with such/audit inspection including, completing and returning questionnaires and making available its knowledgeable representatives. Buyer’s failure to inspect or test goods, materials or services or Buyer’s failure to reject or detect defects by inspection or testing shall not relieve Supplier from its warranty obligations or any of its other obligations or responsibilities under this Order. Supplier agrees to provide small business as well as minority and/or women owned business utilization and demographic data upon request.

  • Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Meter Testing Company shall provide at least twenty-four (24) hours' notice to Seller prior to any test it may perform on the revenue meters or metering equipment. Seller shall have the right to have a representative present during each such test. Seller may request, and Company shall perform, if requested, tests in addition to the every fifth-year test and Seller shall pay the cost of such tests. Company may, in its sole discretion, perform tests in addition to the fifth year test and Company shall pay the cost of such tests. If any of the revenue meters or metering equipment is found to be inaccurate at any time, as determined by testing in accordance with this Section 10.2 (Meter Testing), Company shall promptly cause such equipment to be made accurate, and the period of inaccuracy, as well as an estimate for correct meter readings, shall be determined in accordance with Section 10.3 (Corrections).

  • Outage Restoration If an outage on the Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades of the Connecting Transmission Owner or Developer adversely affects the other Party’s operations or facilities, the Party that owns the facility that is out of service shall use Reasonable Efforts to promptly restore such facility(ies) to a normal operating condition consistent with the nature of the outage. The Party that owns the facility that is out of service shall provide the other Party and NYISO, to the extent such information is known, information on the nature of the Emergency State, an estimated time of restoration, and any corrective actions required. Initial verbal notice shall be followed up as soon as practicable with written notice explaining the nature of the outage.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.