Retest Tolerances Sample Clauses

Retest Tolerances. If the Length/Strength, Color, or Trash test results indicate that the measurements from the two sides of the bale are not within the Retest Tolerance limits, an error message is displayed beside the measured value out of tolerance. When this occurs, the test for that property must be performed again. If, after the sample is retested, the values are still outside the retest tolerance limits, this is an indication that the sample came from a “two-sided” bale.
AutoNDA by SimpleDocs

Related to Retest Tolerances

  • Tolerances 1. If a non-originating material used in the production of a product does not satisfy the requirements set out in Annex 3-B, the product shall be considered as originating in a Party, provided that:

  • ROAD TOLERANCES Purchaser shall perform road work within the tolerances listed below. The tolerance class for each road is listed on the TYPICAL SECTION SHEET. Tolerance Class A B C Road and Subgrade Width (feet) +1.5 +1.5 +2.0 Subgrade Elevation (feet +/-) 0.5 1.0 2.0 Centerline alignment (feet lt./rt.) 1.0 1.5 3.0 1-6 ORDER OF PRECEDENCE Any conflict or inconsistency in the road plan will be resolved by giving the documents precedence in the following order:

  • Tolerance Average net mass of cement packed in bags in a sample shall be equal to or more than 50kg. If and as desired by the Engineer-in-Charge, the number of samples to be checked for net mass of cement per bag, in a given number of bags shall be as given below: 100 to 150 bags : 20 sample 150 to 280 bags : 32 sample 281 to 500 bags : 50 sample 501 to 1200 bags : 80 sample 1201 to 3200 bags : 125 sample 3201 and above : 200 sample The bags in a sample shall be selected at random. B- Sand (Fine Aggregate)

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Technical Characteristics The Participating Generator has provided to the CAISO in Schedule 1 the required information regarding the capacity and operating characteristics of each of the Generating Units listed in that schedule. Pursuant to Sections 8.9 and 8.10 of the CAISO Tariff, the CAISO may verify, inspect and test the capacity and operating characteristics provided in Schedule 1.

  • Outputs 11. The objectives and outcomes of this Agreement will be achieved by:

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Tests 7.7.1 If the Contract Documents, laws, ordinances, rules, regulations or orders of any public authority having jurisdiction require any portion of the Work to be inspected, tested or approved, the Contractor shall give the Architect timely notice of its readiness so the Architect may observe such inspection, testing or approval. The Contractor shall bear all costs of such inspections, tests or approvals conducted by public authorities.

  • Workloads (a) The parties agree that patient care is enhanced if concerns relating to professional practice, patient acuity, fluctuating Work-Loads and fluctuating staffing are resolved in a timely and effective manner.

  • Temperature Where low temperature and/or self-service cases are used for any of such merchandise coming under the jurisdiction of the Union, such cases shall be served only by employees covered by this Agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.