RTMC OPERATOR 2 Sample Clauses

RTMC OPERATOR 2. The RTMC Operator 2 position is responsible for the principal monitoring of the roadways including detecting, confirming, updating and responding to scheduled and unscheduled traffic events, congestion and travel time imbalances in the geographical coverage area with monitoring and/or surveillance capabilities. The Operator 2 position is an extension of the RTMC Operations Shift Leader and provides quality assurance for the day-to-day handling of all events in the control room. 6.22.1 Monitoring traffic status (by CCTV, Road Ranger and by GUI display/detector data), scheduled events, active events, equipment fault status, etc. 6.22.2 Managing events and congestion using the RTMC GUI and its devices, both electronic (e.g., website server, incident detection algorithms) and in the field (e.g., vehicle detection stations, CCTV cameras, DMS, etc.). 6.22.3 Dispatch Road Rangers to motorists, events and other activities that require their assistance in a timely and efficient manner. Log all activities into the SMART database and ensure the quality of information is complete and concise. 6.22.4 Detecting, confirming and tracking equipment faults affecting control room equipment (e.g., central system, computers, CCTV monitors, large screen display units) and RTMC system field equipment (e.g., CCTV, VDS, DMS). 6.22.5 Coordinating with other operations staff with regards to external agency communications and general control room coordination, and other control room staff from other agencies to obtain a full understanding of all control room activity status.
AutoNDA by SimpleDocs

Related to RTMC OPERATOR 2

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.

  • Operator Services General Requirements

  • Co-operation Each Party acknowledges that this ESA must be approved by the Department and agree that they shall use Commercially Reasonable efforts to cooperate in seeking to secure such approval.

  • Operator The Optionee shall be the operator for purposes of developing and executing exploration programs.

  • OGS Centralized Contract Terms and Conditions have been renumbered as depicted in the following chart: Current Amended Section Title 4.25 4.26 Severability 4.26 4.27 Entire Agreement

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5

  • Radiation Therapy/Chemotherapy Services This plan covers chemotherapy and radiation services. This plan covers respiratory therapy services. When respiratory services are provided in your home, as part of a home care program, durable medical equipment, supplies, and oxygen are covered as a durable medical equipment service.

  • List of Operator’s Subprocessors [Box 26] [Box 27] [Box 28] [Box 29]

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.