Sale of Geo-Thermal System. (a) Pursuant to the Construction Contract, the Developer will be responsible for ensuring that the Project has an appropriate and functioning heating and cooling system that complies with all applicable Law, all Development Approvals and each New APS. (b) Pursuant to the Settlement Approval Order, the Developer has been granted a first priority Court ordered charge against the proceeds of sale from the existing Geo-thermal System if repaired and commissioned by the Developer pursuant to the Construction Contract (the “Craft Collateral”), as security for the payment of the documented Geo-thermal System Costs and/or any Craft Loan advanced to fund Geo-thermal System Costs (“Geo-thermal Loan”). (c) Craft will market and sell the right to operate and, if legally possible and available, own the Geo-thermal System through a marketing process and upon terms and conditions satisfactory to the Construction Receiver and the Developer or as otherwise approved by the Court in the UC Receivership Proceedings (“Geo-thermal System Marketing Process”). The proceeds from any sale of the right to operate or own the Craft Collateral (the “Geo-thermal System Proceeds”) shall be applied as follows: (i) first, to be credited against (without duplication) the documented Geo-thermal System Costs and/or any Geo-thermal Loan; and (ii) the balance, if any, to payment of costs and claims in accordance with the priorities set out in the Waterfall. (d) The Owner and Construction Receiver acknowledge that the Developer does not represent or warrant that the right to operate and/or own the Geo-thermal System will be saleable. If the right to operate and/or own the Geo-thermal System is not sold through the Geo-thermal Marketing Process: (i) the Construction Receiver shall be entitled to dispose of the Geo-thermal System as it may determine in its discretion (or as may be approved by the Court in the UC Receivership Proceedings) including by conveying to the Condominium Corporation the Geo-thermal System for an approximate purchase price of $800,000 as contemplated in the draft form of declaration establishing the Condominium proposed to be approved by the Purchaser Package Approval Order; and (ii) the full amount of the documented Geo-thermal System Costs and/or any Geo-thermal Loan shall be payable to the Developer in accordance with the priorities set out in the Waterfall.
AutoNDA by SimpleDocs

Related to Sale of Geo-Thermal System

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location. 2.8.4.2 USLF utilized for voice traffic can be configured as 2-wire voice (USLF-2W/V) or 4-wire voice (USLF-4W/V). 2.8.4.3 USLF utilized for digital traffic can be configured as 2-wire ISDN (USLF-2W/I); 2-wire Copper (USLF-2W/C); 4-wire Copper (USLF-4W/C); 4-wire DS0 level loop (USLF-4W/D0); or 4-wire DS1 and ISDN (USLF-4W/DI). 2.8.4.4 USLF will provide access to both the equipment and the features in the BellSouth central office and BellSouth cross box necessary to provide a 2W or 4W communications pathway from the BellSouth central office to the BellSouth cross- box. This element will allow for the connection of Lightyear’s loop distribution elements onto BellSouth's feeder system.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA. (b) If the HSP is not subject to the procurement provisions of the BPSAA, the HSP will have a procurement policy in place that requires the acquisition of supplies, equipment or services valued at over $25,000 through a competitive process that ensures the best value for funds expended. If the HSP acquires supplies, equipment or services with the Funding it will do so through a process that is consistent with this policy.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Other Methods of Procurement of Goods and Works The following table specifies the methods of procurement, other than International Competitive Bidding, which may be used for goods and works. The Procurement Plan shall specify the circumstances under which such methods may be used: (a) National Competitive Bidding (b) Shopping (c) Direct Contracting

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • SUB-CONTRACTING 31.1. The Authority approves the appointment of the sub-contractors specified in Schedule 10 (Approved Sub-contractors) in respect of the obligations specified in that Schedule. 31.2. The Contractor may not sub-contract its obligations under the Framework Agreement to other sub-contractors without the prior written consent of the Authority. Sub-contracting of any part of the Framework Agreement shall not relieve the Contractor of any obligation or duty attributable to the Contractor under the Framework Agreement. The Contractor shall be responsible for the acts and omissions of its sub-contractors as though they are its own. 31.3. Where the Contractor enters into a sub-contract the Contractor must ensure that a provision is included which: 31.3.1. requires payment to be made of all sums due by the Contractor to the sub- contractor within a specified period not exceeding 30 days from the receipt of a valid invoice as defined by the sub-contract requirements and provides that, where the Authority has made payment to the Contractor in respect of Services and the sub-contractor’s invoice relates to such Services then, to that extent, the invoice must be treated as valid and, provided the Contractor is not exercising a right of retention or set-off in respect of a breach of contract by the sub-contractor or in respect of a sum otherwise due by the sub-contractor to the Contractor, payment must be made to the sub-contractor without deduction; 31.3.2. notifies the sub-contractor that the sub-contract forms part of a larger contract for the benefit of the Authority and that should the sub-contractor have any difficulty in securing the timely payment of an invoice, that matter may be referred by the sub- contractor to the Authority; 31.3.3. requires that all contracts with subcontractors and suppliers which the subcontractor intends to procure, and which the subcontractor has not before the date of this Framework Agreement, already planned to award to a particular supplier are advertised through the Public Contracts Scotland procurement portal (xxx.xxxxxxxxxxxxxxxxxxxxxxx.xxx.xx) and awarded following a fair, open, transparent and competitive process proportionate to the nature and value of the contract; and 31.3.4. is in the same terms as that set out in this clause 31.3 (including for the avoidance of doubt this clause 31.3.4) subject only to modification to refer to the correct designation of the equivalent party as the Contractor and sub-contractor as the case may be. 31.4. The Contractor shall include in every sub-contract: 31.4.1 a right for the Contractor to terminate that sub-contract if the relevant sub- contractor fails to comply in the performance of its contract with legal obligations in the fields of environmental, social or employment law or if any of the termination events (involving substantial modification of the Contract, contract award despite the existence of exclusion grounds or a serious infringement of EU legal obligations) specified in clause 42.4 occur; and 31.4.2 a requirement that the sub-contractor includes a provision having the same effect as 31.4.1 in any sub-contract which it awards. In this Clause 31.4, ‘sub-contract’ means any contract between two or more contractors, at any stage of remoteness from the Authority in a sub-contracting chain, made wholly or substantially for the purpose of performing (or contributing to the performanace of) the whole or any part of this Framework Agreement. 31.5. Where requested by the Authority, copies of any sub-contract must be sent by the Contractor to the Authority as soon as reasonably practicable. 31.6. Where the Contractor proposes to enter into a sub-contract it must: 31.6.1 advertise its intention to do so in at least one trade journal, and the Public Contracts Scotland Portal; and 31.6.2 follow a procedure leading to the selection of the sub-contractor which ensures reasonable competition following principles of equal treatment, non-discrimination and transparency and which ensures that such procedure is accessible by small and medium enterprises.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!