SCAFFOLD PLANKS Sample Clauses

SCAFFOLD PLANKS. Clean materials such as excessive cement, mortar, concrete, oil, grease and paint from scaffold planks. Do not use timber planks painted in a way that could conceal defects. Replace missing or damaged end-fixings and remove protruding nails. Figure 13.9(A) illustrates faults in timber scaffold planks. Where a timber scaffold plank is suspected of being too weak for its intended purpose, it can be tested by impact tests as specified in Appendix J. Figure 13.9(B) illustrates faults in typical metal scaffold planks. Replace damaged or missing end caps or reinforcing straps. Cracks in welds should be ground out and repaired by re- welding. Surface dents should be knocked out if practical, otherwise the plank should be shortened or scrapped. Licensed to Linc Scaffolding on 19-Jul-2017. 1 user personal license only. Copying, copy/pasting, storage & distribution or use on network prohibited. Get permission to copy from or network this publication xxx.xxxxxxxxx.xxx/xxxxxxxxx FIGURE 13.8 COMMON DEFECTS IN SCAFFOLD TUBES
AutoNDA by SimpleDocs

Related to SCAFFOLD PLANKS

  • Scaffolding The Landlord must ensure that any scaffolding erected outside the Premises in exercise of the Landlord's rights under this Lease: is not erected or retained (unless in an emergency) during the months of January, November and December or during the one week period either side of Easter Sunday, in each year; is removed as soon as reasonably practicable, with any damage caused to the exterior of the Premises made good; causes as little obstruction as is reasonably practicable to the entrances to the Premises and the Centre; and does not have advertising displayed on it (except for any health and safety notices and signs relating to any other tenant whose premises are obstructed or interfered with by the scaffolding) unless the Tenant has consented to its display. If the Tenant's sign and fascia or display window is obstructed or interfered with by the scaffolding, the Landlord will permit the Tenant to display a sign (approved by the Landlord) on the exterior of the scaffolding in front of the Premises so that it is visible to the public. [Turnover Information The Landlord will only use any information provided to the Landlord under Clause 4.24 for management purposes in connection with the monitoring and assessment of sales at and the performance of the Centre. The Landlord may disclose it to the following people on the terms of Clause 5.7.2: the Landlord's advisors and funders; any party (and their advisors and funders) interested in acquiring the Landlord's interest in the Centre; where required by law; and where required by the rules of any listing authority. Where the Landlord is allowed to disclose the information to someone else under this Clause 5.7, the Landlord will stress its confidential nature.] Change in the extent of the Centre The Landlord may change the extent of the Centre but any changes must not: materially increase the amount of Service Charge payable by the Tenant; or materially prejudice: the Tenant's use and occupation of the Premises; or the rights, facilities and amenities granted to the Tenant under this Lease.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • FABRICATION Making up data or results and recording or reporting them.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Provisioning of Line Sharing and Splitter Space 3.2.1 BellSouth will provide ONS with access to the High Frequency Spectrum as follows:

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

Time is Money Join Law Insider Premium to draft better contracts faster.