Scope of Work Airport Architectural Engineering Services. In general, the A-E shall provide engineering and professional services for various airport related studies, projects, and investigations in accordance to the current edition of the Architect-Engineer Guide. A-E professional services shall include, but are not limited to, the following examples of airport related tasks: A. Preliminary and Program Phase 1. Perform engineering evaluation, feasibility studies and/or design for airport facilities and infrastructure per local, state, County Airports, and FAA standards /guidelines, including but not limited to airfield pavements, airfield lighting systems, NAVAIDs, baggage handling systems, roadways, bridges, security systems, technology, fueling, and any other associated airport related facilities/infrastructure within airside, landside, terminal and airspace. 2. Coordinating with the County on project scope requirements, finances, schedules, operational safety and phasing considerations, site access and other pertinent matters. 3. As applicable, coordinating project with County personnel and other interested stakeholders, such as FAA, to identify potential impacts to their operations. 4. Manage and prepare environmental documents for CEQA and NEPA. 5. Perform review of General Aviation Improvement project plans and when required, perform assessment to ensure proposed projects are consistent with approved environmental clearance documents. 6. Peer review of submitted plans and specifications of airport projects. 7. Perform Independent Fee Estimate (IFE) for a variety of projects. B. Design Phase 1. Airport Engineering support services may include, but are not limited to the following: i. Updating and Maintaining Airport Layout Plan and assist JWA with keeping compliance with Airport Certification (Part 139) compliance. ii. Provide Aviation Forecasting and analysis of Airport capacity and Delay. iii. Assist JWA with Strategic Planning. iv. Assist JWA with assessing and providing recommendations on Commercial Aeronautical Activities. v. Perform evaluations and simulations of airport terminal, airside and landside processes and systems to assess constraints, modifications, and other what-if scenarios. vi. Design of airport facilities and supporting building systems. vii. Design of the removal, relocation, or addition of walls and doors in airport buildings. 2. Transportation and Traffic support services may include, but are not limited to the following: i. Perform traffic analysis pertaining to traffic congestion, hazards, and parking conditions at JWA. ii. Prepare traffic control plans and/or bridge striping and striping plans. iii. Provide traffic signal studies for design and preparation of traffic impact studies for airport development projects. iv. Provide various traffic research and inspection reports as required by JWA. v. Review code variance for traffic access and approve or recommend corrective actions. vi. Direct, coordinate, supervise, and review the collection, tabulation and analysis of traffic information pertaining to traffic congestion, hazards, and parking conditions. vii. Plan, organize, and direct programs for the development and implementation of traffic control systems, methods and devices. viii. Design projects for the implementation of traffic control systems, signage and parking functions. ix. Plan and design of parking facilities. x. Evaluate and recommend parking access and revenue control systems. xi. Plan and design of overhead roadway signs. xii. Plan and design of street lighting poles. xiii. Plan and design new projects such as roads, storm drains and waste management systems. xiv. Perform Aircraft parking and movement analysis and design. 3. Structural support services may include, but are not limited to the following: i. Inspection and analysis of buildings or other structures for existing conditions relative to current seismic design and construction requirements with recommendations for retrofitting if needed. ii. Assess various loads acting on a building or other structure, including dead loads, imposed loads, wind loads, and others in accordance with the relevant safety specifications. iii. Select suitable structural systems to carry these loads safely to the foundation depending on the nature of the soil. iv. Calculate the dimensions of beams, columns, slabs, walls, foundations, staircases, lift xxxxx, etc. in accordance with the relevant standard specifications. v. Plan review for seismic and foundation requirements. 4. Environmental support services may include, but are not limited to the following: i. Electrical Vehicle charging ii. Central Plant Emissions iii. CUP chilled water treatment system
Appears in 3 contracts
Samples: Contract, Professional Services, Professional Services
Scope of Work Airport Architectural Engineering Services. In general, the A-E shall provide engineering and professional services for various airport related studies, projects, and investigations in accordance to the current edition of the Architect-Engineer Guide. A-E professional services shall include, but are not limited to, to the following examples of airport related tasks:
A. Preliminary and Program Phase
1. Perform engineering evaluation, feasibility studies and/or design for airport facilities and infrastructure per local, state, County Airports, and FAA standards /guidelines, including but not limited to airfield pavements, airfield lighting systems, NAVAIDs, baggage handling systems, roadways, bridges, security systems, technology, fueling, and any other associated airport related facilities/infrastructure within airside, landside, terminal and airspace.
2. Coordinating with the County on project scope requirements, finances, schedules, operational safety and phasing considerations, site access and other pertinent matters.
3. As applicable, coordinating project with County personnel and other interested stakeholders, such as FAA, to identify potential impacts to their operations.
4. Manage and prepare environmental documents for CEQA and NEPA.
5. Perform review of General Aviation Improvement project plans and when required, perform assessment to ensure proposed projects are consistent with approved environmental clearance documents.
6. Peer review of submitted plans and specifications of airport projects.
7. Perform Independent Fee Estimate (IFE) for a variety of projects.
B. Design Phase
1. Airport Engineering support services may include, but are not limited to the following:
i. Updating and Maintaining Airport Layout Plan and assist JWA with keeping compliance with Airport Certification (Part 139) compliance.
ii. Provide Aviation Forecasting and analysis of Airport capacity and Delay.
iii. Assist JWA with Strategic Planning.
iv. Assist JWA with assessing and providing recommendations on Commercial Aeronautical Activities.
v. Perform evaluations and simulations of airport terminal, airside and landside processes and systems to assess constraints, modifications, and other what-if scenarios.
vi. Design of airport facilities and supporting building systems.
vii. Design of the removal, relocation, or addition of walls and doors in airport buildings.. DocuSign Envelope ID: 8E15C1F8-CEAO-4F2E-835E-58DB1E9O725A
2. Transportation and Traffic support services may include, but are not limited to the following:
i. Perform traffic analysis pertaining to traffic congestion, hazards, and parking conditions at JWA.
ii. Prepare traffic control plans and/or bridge striping and striping plans.
iii. Provide traffic signal studies for design and preparation of traffic impact studies for airport development projects.
iv. Provide various traffic research and inspection reports as required by JWA.
v. Review code variance for traffic access and approve or recommend corrective actions.
vi. Direct, coordinate, supervise, and review the collection, tabulation and analysis of traffic information pertaining to traffic congestion, hazards, and parking conditions.
vii. Plan, organize, and direct programs for the development and implementation of traffic control systems, methods and devices.
viii. Design projects for the implementation of traffic control systems, signage and parking functions.
ix. Plan and design of parking facilities.
x. Evaluate and recommend parking access and revenue control systems.
xi. Plan and design of overhead roadway signs.
xii. Plan and design of street lighting poles.
xiii. Plan and design new projects such as roads, storm drains and waste management systems.
xiv. Perform Aircraft parking and movement analysis and design.
3. Structural support services may include, but are not limited to the following:
i. Inspection and analysis of buildings or other structures for existing conditions relative to current seismic design and construction requirements with recommendations for retrofitting if needed.
ii. Assess various loads acting on a building or other structure, including dead loads, imposed loads, wind loads, and others in accordance with the relevant safety specifications.
iii. Select suitable structural systems to carry these loads safely to the foundation depending on the nature of the soil.
iv. Calculate the dimensions of beams, columns, slabs, walls, foundations, staircases, lift xxxxx, etc. in accordance with the relevant standard specifications.
v. Plan review for seismic and foundation requirements.. DocuSign Envelope ID: 8E15C1F8-CEAO-4F2E-835E-58DB1E9O725A
4. Environmental support services may include, but are not limited to the following:
i. Electrical Vehicle charging;
ii. Central Plant Emissions Emissions; iii. CUP chilled water treatment system
Appears in 1 contract
Samples: Contract
Scope of Work Airport Architectural Engineering Services. In general, the A-E shall provide engineering and professional services for various airport related studies, projects, and investigations in accordance to the current edition of the Architect-Engineer Guide. A-E professional services shall include, but are not limited to, the following examples of airport related tasks:
A. Preliminary and Program Phase
1. Perform engineering evaluation, feasibility studies and/or design for airport facilities and infrastructure per local, state, County Airports, and FAA standards /guidelines, including but not limited to airfield pavements, airfield lighting systems, NAVAIDs, baggage handling systems, roadways, bridges, security systems, technology, fueling, and any other associated airport related facilities/infrastructure within airside, landside, terminal and airspace.
2. Coordinating with the County on project scope requirements, finances, schedules, operational safety and phasing considerations, site access and other pertinent matters.
3. As applicable, coordinating project with County personnel and other interested stakeholders, such as FAA, to identify potential impacts to their operations.
4. Manage and prepare environmental documents for CEQA and NEPA.
5. Perform review of General Aviation Improvement project plans and when required, perform assessment to ensure proposed projects are consistent with approved environmental clearance documents.
6. Peer review of submitted plans and specifications of airport projects.
7. Perform Independent Fee Estimate (IFE) for a variety of projects.
B. Design Phase
1. Airport Engineering support services may include, but are not limited to the following:
i. Updating and Maintaining Airport Layout Plan and assist JWA with keeping compliance with Airport Certification (Part 139) compliance.
ii. Provide Aviation Forecasting and analysis of Airport capacity and Delay.
iii. Assist JWA with Strategic Planning.
iv. Assist JWA with assessing and providing recommendations on Commercial Aeronautical Activities.
v. Perform evaluations and simulations of airport terminal, airside and landside processes and systems to assess constraints, modifications, and other what-if scenarios.
vi. Design of airport facilities and supporting building systems.
vii. Design of the removal, relocation, or addition of walls and doors in airport buildings.
2. Transportation and Traffic support services may include, but are not limited to the following:
i. Perform traffic analysis pertaining to traffic congestion, hazards, and parking conditions at JWA.
ii. Prepare traffic control plans and/or bridge striping and striping plans.
iii. Provide traffic signal studies for design and preparation of traffic impact studies for airport development projects.
iv. Provide various traffic research and inspection reports as required by JWA.
v. Review code variance for traffic access and approve or recommend corrective actions.
vi. Direct, coordinate, supervise, and review the collection, tabulation and analysis of traffic information pertaining to traffic congestion, hazards, and parking conditions.
vii. Plan, organize, and direct programs for the development and implementation of traffic control systems, methods and devices.
viii. Design projects for the implementation of traffic control systems, signage and parking functions.
ix. Plan and design of parking facilities.
x. Evaluate and recommend parking access and revenue control systems.
xi. Plan and design of overhead roadway signs.
xii. Plan and design of street lighting poles.
xiii. Plan and design new projects such as roads, storm drains and waste management systems.
xiv. Perform Aircraft parking and movement analysis and design.
3. Structural support services may include, but are not limited to the following:
i. Inspection and analysis of buildings or other structures for existing conditions relative to current seismic design and construction requirements with recommendations for retrofitting if needed.
ii. Assess various loads acting on a building or other structure, including dead loads, imposed loads, wind loads, and others in accordance with the relevant safety specifications.
iii. Select suitable structural systems to carry these loads safely to the foundation depending on the nature of the soil.
iv. Calculate the dimensions of beams, columns, slabs, walls, foundations, staircases, lift xxxxx, etc. in accordance with the relevant standard specifications.
v. Plan review for seismic and foundation requirements.
4. Environmental support services may include, but are not limited to the following:
i. Electrical Vehicle charging
ii. Central Plant Emissions iii. CUP chilled water treatment system
Appears in 1 contract
Samples: Contract for Professional Services