SEPARATING LINER SYSTEM (JACKET Sample Clauses

SEPARATING LINER SYSTEM (JACKET. The combined moisture barrier and the thermal liner shall be completely removable for the jacket. The thermal liner and moisture barrier layers of the AXTION liner system shall be constructed in such a way as to allow the layers to separate for improved air flow, drying and interior service and replacement. The thermal liner and moisture barrier layers shall be stitched together at the sleeve cuff ends and hem of the rear body panels only. The leading edges and hem of the left and right front body panels of the thermal liner and moisture barrier layers shall fasten together with snap fasteners. The snap fasteners shall be evenly spaced along the opening edge of the layers and set in bias-cut reinforcement fabric. The neck area of the liner system shall attach up inside the outer shell collar with two strips of ⅝ inch wide flame resistant FR Velcro® fastener tape on the front and rear of the collar. Loop fastener tape installed along the neck of the thermal liner shall secure to hook fastener tape installed along the front inside edge of the top collar. Hook fastener tape installed along the neck of the moisture barrier layer of the liner system shall extend upward into the underside of collar and attach to the loop fastener tape installed along the full length of the inside back layer of the collar. The outside perimeter of the AXTION liner moisture barrier and thermal liner layers shall be bound with a bias-cut Neoprene coated cotton/polyester binding for a finished appearance that prevents fraying and wicking of contaminants. Stitching used to secure the thermal liner and moisture barrier in place of the Neoprene shall not be considered since stitching is not able to provide the same level of abrasion resistance.
AutoNDA by SimpleDocs

Related to SEPARATING LINER SYSTEM (JACKET

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Network Resource Interconnection Service (check if selected)

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • Bandwidth the amount of data (quantified as “Mbps” or “Gbps”) made available to Customer as specified in a Service Order.

  • NETWORK INTERCONNECTION METHODS 64.1 This Section sets forth the terms and conditions for Network Interconnection Methods (NIMs) provided between CenturyLink and CLEC for the Interconnection Facilities established between the Parties’ networks. Additionally, this Section describes the physical architecture for the Interconnection of the Parties’ facilities and equipment required for the transmission and routing of Local Traffic, ISP-Bound Traffic, IntraLATA LEC Toll Traffic, VoIP-PSTN Traffic, Transit Traffic and Jointly Provided Switched Access Service Traffic.

  • Shiftwork 38.1 Shift Penalties (Excluding Home Care Classifications)

  • PROPANE GAS SYSTEM SERVICE AREA If the Property is located in a propane gas system service area owned by a distribution system retailer, Seller must give Buyer written notice as required by §141.010, Texas Utilities Code. An addendum containing the notice approved by TREC or required by the parties should be used.

Time is Money Join Law Insider Premium to draft better contracts faster.