Series Production, Traceability, Identification, Deliveries. In case of process disturbances and quality deviations, the causes must be analyzed, improvement measures must be introduced, and their effectiveness must be checked. If the supplier detects deviations from the specification, a written exception must be obtained from GGB before the products are shipped. GGB must also be notified immediately of any deviations detected subsequently. The supplier undertakes to ensure the traceability of the products delivered by him. In the event of a detected defect, traceability must be possible in such a way that the quantities of defective parts / products can be limited (e.g. batch tracing). The supplier shall ensure that the products are delivered in suitable means of transport approved by GGB to avoid damage and quality degradation (e.g. contamination, chemical reaction). Different batches must be delivered separately packed and labelled. Regarding the labelling of products, parts and packaging, the requirements agreed with GGB must be observed. Deviations from existing labelling obligations require a written agreement between the supplier and GGB.
Appears in 4 contracts
Samples: www.ggbearings.com, www.ggbearings.com, www.ggbearings.com
Series Production, Traceability, Identification, Deliveries. In case of process disturbances and quality deviations, the causes must be analyzed, improvement measures must be introduced, and their effectiveness must be checked. If the supplier detects deviations from the specificationspecification, a written exception must be obtained from GGB before the products are shipped. GGB must also be notified notified immediately of any deviations detected subsequently. The supplier undertakes to ensure the traceability of the products delivered by him. In the event of a detected defect, traceability must be possible in such a way that the quantities of defective parts / products can be limited (e.g. batch tracing). The supplier shall ensure that the products are delivered in suitable means of transport approved by GGB to avoid damage and quality degradation (e.g. contamination, chemical reaction). Different batches must be delivered separately packed and labelled. Regarding the labelling of products, parts and packaging, the requirements agreed with GGB must be observed. Deviations from existing labelling obligations require a written agreement between the supplier and GGB.
Appears in 2 contracts
Samples: www.ggbearings.com, www.ggbearings.com