SHOP PAINTING Sample Clauses

SHOP PAINTING. All components and members of steel work shall be given one shop coat of red oxide zinc chromate primer (conforming to is:2074) or any other primer as specified, in the tender, immediately after the surfaces have been properly prepared (i.e. Degreased, derusted, descaled and cleaned) in accordance with is:1477. The primer coat shall be applied over completely dry surfaces (using brushes of good quality) in a manner so as to ensure a continuous and uniform film without "holidaying". Special care shall be taken to cover all the crevices, corners, edges etc. However, in areas which are difficult to reach by brushing, daubers/mops shall be used by dipping the same in paint and then pulling/pushing them through the narrow spaces. The primer coat shall be air dried and shall have minimum film thickness of 25 microns. Surfaces which are inaccessible after shop assembly, shall receive the full specified protective treatment before assembly (this shall not apply to the interior of sealed hollow sections). Steel surfaces shall not be painted within a suitable distance of any edges to be welded if the paint specified would be harmful to welders or impair the quality of the welds. Welds and adjacent parent metal shall not be painted prior to deslagging and inspection. Parts to be encased in concrete shall have only one coat of primer and shall not be painted after erection.
AutoNDA by SimpleDocs
SHOP PAINTING. A. General: Shop prime structural steel exposed to view which is not to be spray fire proofed, except those members or portions of members to be embedded in concrete or mortar. Paint embedded steel which is partially exposed on exposed portions and initial 2" of embedded areas only.
SHOP PAINTING. A. Chemically clean and phosphate treat (nongalvanized) metal roof deck units and accessories, and apply 1 coat of paint baked-on by manufacturer's standard method. Paint primer shall be in strict conformance with architectural specifications.
SHOP PAINTING. A. Ferrous surfaces of valves and appurtenances shall receive a coating of rust-inhibitive primer. All pipe connection openings shall be capped to prevent the entry of foreign matter prior to installation.

Related to SHOP PAINTING

  • Painting All exterior surfaces and materials requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar alkyd flat exterior finish, or Xxxxxxx-Xxxxxxxx SWP exterior gloss paint. All porous exterior surfaces (e.g. unpainted wood) shall be sealed with 2 coats of Xxxxxxxx’x Water Seal following the manufacturers application instructions. Interior surfaces requiring paint shall be prime coated plus 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar Latex Eg-Shel enamel. Concrete block walls shall receive 1 coat of Xxxxxxx Xxxxxxxx Pro-Mar Block Filler and 2 coats of Xxxxxxx Xxxxxxxx Pro-Mar latex Eg-Shel enamel. Interior finishes and color selections shall be approved by the State. A schedule of colors and finishes shall be prepared by the Owner/Lessor and approved by the State.

  • Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;

  • Decoration 22.1 The Tenant shall decorate the Property as often as is reasonably necessary and also in the last three months before the end of the term.

  • Partitions In order to ensure maximum privacy for clients and to preserve the attorney-client privilege, the Employer agrees to construct floor to ceiling partitions for the offices of all casehandling staff where architecturally feasible. The feasibility of such construction may be limited by the cost relating to lighting and airflow.

  • Windows a. Front and rear windshield per California Vehicle Code § 26710.

  • Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Landscaping Maintaining, tending and cultivating and (as necessary) re-stocking any garden or grassed areas including replacing plants, shrubs and trees as necessary.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

Time is Money Join Law Insider Premium to draft better contracts faster.