Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.
Constructability Review Prepare detailed interdisciplinary constructability review within Fourteen (14) days of receipt of the plans from the District that: 10.1.2.1.6.1 Ensures construction documents are well coordinated and reviewed for errors; 10.1.2.1.6.2 Identifies to the extent known, construction deficiencies and areas of concern; 10.1.2.1.6.3 Back-checks design drawings for inclusion of modifications; and 10.1.2.1.6.4 Provides the District with written confirmation that: 10.1.2.1.6.4.1 Requirements noted in the design documents prepared for the Project are consistent with and conform to the District's Project requirements and design standards. 10.1.2.1.6.4.2 Various components have been coordinated and are consistent with each other so as to minimize conflicts within or between components of the design documents.
Quality Assurance Requirements There are no special Quality Assurance requirements under this Agreement.
Reasonable Suspicion Testing All Employees Performing Safety-Sensitive Functions A. Reasonable suspicion testing for alcohol or controlled substances may be directed by the Employer for any employee performing safety-sensitive functions when there is reason to suspect that alcohol or controlled substance use may be adversely affecting the employee’s job performance or that the employee may present a danger to the physical safety of the employee or another. B. Specific objective grounds must be stated in writing that support the reasonable suspicion. Examples of specific objective grounds include but are not limited to: 1. Physical symptoms consistent with alcohol and/or controlled substance use; 2. Evidence or observation of alcohol or controlled substance use, possession, sale, or delivery; or 3. The occurrence of an accident(s) where a trained manager, supervisor or lead worker suspects alcohol or other controlled substance use may have been a factor.
Project Monitoring Reporting and Evaluation The Recipient shall furnish to the Association each Project Report not later than forty-five (45) days after the end of each calendar semester, covering the calendar semester.
Stability Testing Patheon shall conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees specified in Schedule C. Patheon shall not make any changes to these testing protocols without prior written approval from the Client. In the event that any batch of Products fails stability testing, Patheon and the Client shall jointly determine the proceedings and methods to be undertaken to investigate the causes of such failure, including which party shall bear the cost of such investigation, provided that Patheon shall not be liable for any such costs unless there has been a failure by it to provide the Manufacturing Services in accordance with the Specifications and cGMPs. Patheon will provide any and all data and results relating to the stability testing upon request by the Client.
Money Market Fund Compliance Testing and Reporting Services Subject to the authorization and direction of the Trust and, in each case where appropriate, the review and comment by the Trust’s independent accountants and legal counsel, and in accordance with procedures that may be established from time to time between the Trust and the Administrator, the Administrator will:
Audit and Testing 4.1 The Contractor shall conduct tests of the processes and countermeasures contained in the Security Plan ("Security Tests") on an annual basis or as otherwise agreed by the Parties. The date, timing, content and conduct of such Security Tests shall be agreed in advance with the Authority. 4.2 The Authority shall be entitled to send a representative to witness the conduct of the Security Tests. The Contractor shall provide the Authority with the results of such tests (in a form approved by the Authority in advance) as soon as practicable after completion of each Security Test. 4.3 Without prejudice to any other right of audit or access granted to the Authority pursuant to this Contract, the Authority shall be entitled at any time and without giving notice to the Contractor to carry out such tests (including penetration tests) as it may deem necessary in relation to the Security Plan and the Contractor's compliance with and implementation of the Security Plan. The Authority may notify the Contractor of the results of such tests after completion of each such test. Security Tests shall be designed and implemented so as to minimise the impact on the delivery Services. If such tests impact adversely on its ability to deliver the Services to the agreed Service Levels, the Contractor shall be granted relief against any resultant under-performance for the period of the tests. 4.4 Where any Security Test carried out pursuant to paragraphs 4.2 or 4.3 above reveals any actual or potential security failure or weaknesses, the Contractor shall promptly notify the Authority of any changes to the Security Plan (and the implementation thereof) which the Contractor proposes to make in order to correct such failure or weakness. Subject to the Authority's approval in accordance with paragraph 3.12, the Contractor shall implement such changes to the Security Plan in accordance with the timetable agreed with the Authority or, otherwise, as soon as reasonably possible. For the avoidance of doubt, where the change to the Security Plan to address a non-compliance with the Security Policy or security requirements, the change to the Security Plan shall be at no additional cost to the Authority. For the purposes of this paragraph 4, a weakness means a vulnerability in security and a potential security failure means a possible breach of the Security Plan or security requirements.
Regulation AB Compliance; Intent of Parties; Reasonableness The parties hereto acknowledge that interpretations of the requirements of Regulation AB may change over time, whether due to interpretive guidance provided by the Commission or its staff, consensus among participants in the asset-backed securities markets, advice of counsel, or otherwise, and agree to comply with requests made by the Depositor or the Master Servicer in good faith for delivery of information under these provisions on the basis of evolving interpretations of Regulation AB. In connection with the Trust, the Servicer shall cooperate fully with the Master Servicer and the Depositor to deliver to the Master Servicer and/or the Depositor (including its assignees or designees), any and all statements, reports, certifications, records and any other information available to such party and reasonably necessary in the good faith determination of the Depositor or the Master Servicer to permit the Depositor to comply with the provisions of Regulation AB, together with such disclosures relating to the Servicer reasonably believed by the Depositor or the Master Servicer to be necessary in order to effect such compliance.
Random Testing Notwithstanding any provisions of the Collective Agreement or any special agreements appended thereto, section 4.6 of the Canadian Model will not be applied by agreement. If applied to a worker dispatched by the Union, it will be applied or deemed to be applied unilaterally by the Employer. The Union retains the right to grieve the legality of any imposition of random testing in accordance with the Grievance Procedure set out in this Collective Agreement.