SIGNING AND PAVEMENT MARKINGS (PERMANENT Sample Clauses

SIGNING AND PAVEMENT MARKINGS (PERMANENT. LAYOUTS A. Signing. GCE shall prepare drawings, specifications, and details for all signs. GCE shall coordinate with the County and State for overall temporary, interim, and final signing strategies and placement of signs outside project limits. The proposed signs shall be illustrated and numbered on plan sheets. Sign foundation shall be selected from County and State Standards.
AutoNDA by SimpleDocs

Related to SIGNING AND PAVEMENT MARKINGS (PERMANENT

  • Cutting and Patching The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Sealing and Marking of Tenders 2.17.1 The Tenderer shall seal the original and each copy of the tender in separate envelopes, duly marking the envelopes as “ORIGINAL” and “COPY.” The envelopes shall then be sealed in an outer envelope.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • PACKING AND MARKING Seller shall package all Goods shipped under this Order in accordance with the requirements in this Order, or, if requirements are not specified, in accordance with standard commercial practices customary for similar shipments. When shipping any Goods that are food or food packaging, Seller will ship the Goods under sanitary conditions using carriers suitable for the transport of such Goods that will not render the Goods contaminated with filth, injurious to health, or otherwise adulterated (e.g., carriers that have not been used to transport garbage, waste or other refuse). In each master carton or container in which Goods are shipped, Seller shall include a certificate of analysis, bill of lading, and packing list indicating this Order number, description, quantity, HSY item numbers, and other identifying information corresponding to the information in this Order. Seller shall clearly mark all packages in accordance with all applicable laws and shall label each unit of the Goods with the country of origin, weight, and name of manufacturer. Seller shall ensure that a receiving document/proof-of-delivery is issued to HSY for any shipment made to a third party location. All costs, fines or penalties incurred or assessed due to improper packing or marking will be Seller’s responsibility, and if paid by HSY, will be deducted from amounts owed to Seller. Seller will notify HSY of the number of packages, size, weight, method of protection during shipment and method of storage and protection upon arrival at destination.

  • Sealing and Marking of Bids 21.1 The bidder shall seal the original and each copy of the bid in separate envelopes duly marking the envelopes “ORIGINAL” and “COPY”. The envelopes shall then be sealed in an outer separate envelope.

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf):

  • Parking and Transportation ‌ The Union agrees that during the life of this Agreement, the University may apply changes in transportation policy, including adjusting parking and U-Pass fees and criteria for assigning parking spots, to the bargaining unit without the obligation to bargain with the Union. The Union may raise issues and concerns about the University’s parking program at Joint Labor/Management Committee meetings or at ad hoc Labor Management Committee meetings. The Union shall have a standing seat on the University’s committee(s) that work on transportation and parking issues.

Time is Money Join Law Insider Premium to draft better contracts faster.