Simulation details Sample Clauses

Simulation details. All MD simulations were performed using the GROMACS 5.0.7 software (Xxxxxxx et al., 2015; Pall et al., 2015; Pronk et al., 2013; Xxxx et al., 2008). The simulations were performed in orthorhombic boxes, with periodic boundary conditions imposed in all directions at ambient conditions of temperature (298.15 K) and pressure (1 bar). These conditions are not only relevant to the ones encountered at earth’s surface but also correspond to the CLAYFF force field parameterization. Prior to production runs and in order to eliminate any close contacts between atoms, all systems were subjected to steepest descent energy minimization for 20,000 steps. Then, short equilibration simulations in the canonical (NVT) and isobaric-isothermal (NpT) ensembles were performed. Specifically, all systems were gradually heated to the target temperatures for 100 ps in the NVT ensemble using the Berendsen thermostat (Berendsen et al., 1984), with the coupling constant set to 1 ps. The LINCS algorithm (Xxxx et al., 1997) restrained all bonds involving hydrogen atoms. The integration step of all simulations was set to 2 fs. A simple cut-off scheme for the Xxxxxxx-Xxxxx (LJ) interactions can have minor impact on the molecular arrangement, but can significantly influence simulations of inhomogeneous systems, leading to incorrect estimation of interfacial properties (Xxxx et al., 2007). Therefore, we applied the Particle Mesh Xxxxx (PME) method (Xxxxxx et al., 1993; Xxxxxxx-Xxxxxx et al., 2013) for the long-range LJ interactions as well as for electrostatic interactions (Xxxxxx et al., 1993) with a cut-off at 1.2 nm for the short-range interactions. The Lorentz–Xxxxxxxxx combining rules (Xxxxx and Tildesley, 1987) were used for the cross-interaction LJ parameters. All systems were initially equilibrated for a period of 1 ns in the NpT ensemble, at constant pressure of 1 bar using a Berendsen barostat (Berendsen et al., 1984), with the coupling constant set to 1 ps. Pressure coupling was isotropic in the x and y direction, but semi- isotropic in the z direction, which is perpendicular to the fluid-kaolinite interface. All systems were further equilibrated for 4 ns using the Nosé–Xxxxxx thermostat (Hoower, 1985), while isotropic pressure was maintained using a Xxxxxxxxxx–Rahman (1981) barostat, with a coupling constant set to 5 ps. During this 5 ns period, the density of the liquid phase converged to a mean value, along with the energy of the system. Finally, production runs of 100 ns were...

Related to Simulation details

  • Notice Details Party A: Banque AIG, London Branch Address: {circle} Facsimile No.: {circle} Attention: {circle} Party B: Permanent Financing (No. 4) PLC Address: Xxxxxxxxx Xxxxx Xxxxxxxxx Xxxx Xxxxxx XX0X 0XX Facsimile Number: 020 7566 0975 Attention: The Secretary With a copy to: (i) the Security Trustee:

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • XXX Hosting 10.1 XXX Hosting is not required for resale in the BellSouth region.

  • Tests and Preclinical and Clinical Trials The studies, tests and preclinical and clinical trials conducted by or, to the Company’s knowledge, on behalf of the Company were and, if still ongoing, are being conducted in all material respects in accordance with experimental protocols, procedures and controls pursuant to accepted professional scientific standards and all Authorizations and Applicable Laws, including, without limitation, the Federal Food, Drug and Cosmetic Act and the rules and regulations promulgated thereunder (collectively, “FFDCA”); the descriptions of the results of such studies, tests and trials contained in the Registration Statement, the General Disclosure Package and the Prospectus are, to the Company’s knowledge, accurate in all material respects and fairly present the data derived from such studies, tests and trials; except to the extent disclosed in the Registration Statement, the General Disclosure Package and the Prospectus, the Company is not aware of any studies, tests or trials, the results of which the Company believes reasonably call into question the study, test, or trial results described or referred to in the Registration Statement, the General Disclosure Package and the Prospectus when viewed in the context in which such results are described and the clinical state of development; and, except to the extent disclosed in the Registration Statement, the General Disclosure Package or the Prospectus, neither the Company nor any Subsidiary has received any notices or correspondence from the FDA or any Governmental Entity requiring the termination or suspension of any studies, tests or preclinical or clinical trials conducted by or on behalf of the Company, other than ordinary course communications with respect to modifications in connection with the design and implementation of such trials, copies of which communications have been made available to you.

  • TECHNICAL EVALUATION (a) Detailed technical evaluation shall be carried out by Purchase Committee pursuant to conditions in the tender document to determine the substantial responsiveness of each tender. For this clause, the substantially responsive bid is one that conforms to all the eligibility and terms and condition of the tender without any material deviation. The Institute’s determination of bid’s responsiveness is to be based on the contents of the bid itself without recourse to extrinsic evidence. The Institute shall evaluate the technical bids also to determine whether they are complete, whether required sureties have been furnished, whether the documents have been properly signed and whether the bids are in order. (b) The technical evaluation committee may call the responsive bidders for discussion or presentation to facilitate and assess their understanding of the scope of work and its execution. However, the committee shall have sole discretion to call for discussion / presentation. (c) Financial bids of only those bidders who qualify the technical criteria will be opened provided all other requirements are fulfilled. (d) AIIMS Jodhpur shall have right to accept or reject any or all tenders without assigning any reasons thereof.

  • Procurement Planning Prior to the issuance of any invitations to bid for contracts, the proposed procurement plan for the Project shall be furnished to the Association for its review and approval, in accordance with the provisions of paragraph 1 of Appendix 1 to the Guidelines. Procurement of all goods and works shall be undertaken in accordance with such procurement plan as shall have been approved by the Association, and with the provisions of said paragraph 1.

  • Data Loss Prevention DST shall implement a data leakage program that is designed to identify, detect, monitor and document Fund Data leaving DST’s control without authorization in place.

  • Procurement of Recovered Materials In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired

  • Intrusion Detection All systems involved in accessing, holding, transporting, and protecting DHCS PHI or PI that are accessible via the Internet must be protected by a comprehensive intrusion detection and prevention solution.

  • Distribution of UDP and TCP queries DNS probes will send UDP or TCP “DNS test” approximating the distribution of these queries.