SITE CLEARANCE ETC. 1 Digging up and removing rubbish, debris, vegetation, xxxxxx, shrubs and trees not exceeding 200mm girth, xxxx, etc A1 : 96 A2 : 83 A3 : 78 A4 : 95 2 Stripping average 200mm thick layer of topsoil and stockpiling on site. A1 : 96 A2 : 83 A3 : 78 A4 : 95 EXCAVATION OTHER THAN BULK Excavation in earth not exceeding 2m deep: 3 Trenches. A1 : 3 A2 : 3 A3 : 2 A4 : 2 4 Holes. A1 : 54 A2 : 42 A3 : 24 A4 : 59 5 Reduced levels under floors. A1 : 6 A2 : 5 A3 : 5 A4 : 6 Extra over trench and hole excavations in earth for excavation in: 6 Soft rock. A1 : 6 A2 : 5 A3 : 3 A4 : 7 7 Hard rock. A1 : 3 A2 : 2 A3 : 2 A4 : 3 Extra over all excavations for carting away: m2 352 m2 352 m3 10 m3 179 m3 22 m3 21 m3 10 8 Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor. A1 : 43 A2 : 33 A3 : 18 A4 : 46 Extra over excavations for embankments: m3 140 9 Cutting back steep excavations to create a gradual sloping embankment including levelling and compaction. m3 48 A1 : 13 A2 : 11 A3 : 11 A4 : 13 Risk of collapse of excavations: 10 Sides of trench and hole excavations not exceeding 1,5m deep. A1 : 60 A2 : 50 A3 : 34 A4 : 60 m2 204 Carried to Collection R Section 2 Bill No. 1 Earthworks (Provisional) 11 Ditto, but from ground level to exceeding 1,5m and not exceeding 3,0m deep. A1 : 20 A2 : 17 A3 : 12 A4 : 20 Keeping excavations free of water: m2 69 12 Keeping excavations free from mud and all water including subterranean sources.

Appears in 5 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.